KC-46 Landing Gear PBL

SOL #: SPRHA1-26-R-4646Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA AVIATION AT OGDEN, UT
HILL AIR FORCE BASE, UT, 84056-5820, United States

Place of Performance

Place of performance not available

NAICS

Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)

PSC

Aircraft Landing Gear Components (1620)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 22, 2025
2
Last Updated
May 13, 2026
3
Submission Deadline
Jul 28, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Aviation at Ogden, UT has issued Solicitation SPRHA1-26-R-4646 for KC-46 Landing Gear Performance Based Logistics (PBL). This Total Small Business Set-Aside opportunity seeks remanufacture and overhaul support for KC-46 Landing Gear Depot Level Repairables (DLRs), including shipsets and field-level subcomponents. Proposals are due July 28, 2026.

Scope of Work

This contract requires 100% overhaul/remanufacture support for KC-46 Main Landing Gear (MLG) and Nose Landing Gear (NLG) shipsets for 10-year Time Change Intervals (TCI), and 100% field-level support for sub-components. Services include disassembly, inspection, remanufacture, modification, and testing per 14 CFR Part 43 and Component Maintenance Manuals (CMMs). The contractor must furnish all materials not provided as Government Furnished Material (GFM) and comply with SAE AS 9110 quality standards. Work excludes separate wheel, tire, and brake assemblies.

Contract Details

  • Type: Single-Award, Requirements-Type Contract
  • Duration: 5-year basic period + one 5-year option period (10 years total)
  • Pricing: Firm Fixed Price (FFP) with Economic Price Adjustment (EPA) for shipsets (PPR) and sub-components (PPE). Over and Above (O&A) parts procedures are allowed for subcomponent overhauls, with reimbursement for actual costs incurred prior to Best Estimated Return (BER) determinations.
  • Performance Metrics: Key metrics include an Exchange Lead Time (ELT) of 82 days for shipsets (75 days remanufacture + 7 days transport) and Remanufacture Turn Around Time (RTAT) for sub-components. Incentives are available for achieving at least 80% On-Time Delivery (OTD) for shipsets, with disincentives for ELT/RTAT failures.
  • Compliance: Adherence to FAA regulations, CMMs, safety, environmental regulations, and a comprehensive Supply Chain Risk Management (SCRM) plan (covering COOP, Foreign Influence, Cybersecurity) is mandatory. FAR 52.222-90 (Addressing DEI Discrimination) is incorporated by reference.

Evaluation & Submission

  • Evaluation Factors: Technical (Remanufacture Capability and Capacity, ELT, RTAT) is the most important factor, followed by Price, then Past Performance. Award will be based on best overall value.
  • Technical Proposal: Must demonstrate capability for KC46-2C LG or commercial equivalent overhaul/remanufacture, FAA compliance, ability to meet ELT/RTAT, engineering expertise, subcomponent sourcing, and capacity. Proposals should be based on the 767-300F series landing gear, identifying any remanufacture gaps to the 2C gear, as KC-46 CMMs will not be provided prior to award.
  • Past Performance: Offerors must submit relevant contracts with a narrative justifying their relevance. Client authorization letters are required for commercial contracts.
  • AS9110 Certification: Mandatory prerequisite for award; offerors not yet certified can submit a plan to obtain it prior to contract award.
  • Submission: Electronic via DoD SAFE. Proposals are due July 28, 2026, at 4:00 PM.

Key Updates & Clarifications

Multiple amendments and Q&A documents have clarified requirements, including:

  • Updated sections L & M regarding AS9110 certification, proposal formatting (11x17 figures allowed), and teaming agreements.
  • Clarification on part numbers (USAF top-level assembly numbers, no single OEM shipset PN).
  • Procedures for handling parts beyond CMM repairability and GFM management.
  • The latest amendment (0005) updated the TRD Main and Appendix A to include O&A parts procedures for subcomponent overhauls and a mechanism for reimbursement of costs prior to BER determinations.

People

Points of Contact

Kyle SwanerPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 12Viewing
Solicitation
Posted: May 13, 2026
Version 11
Solicitation
Posted: Apr 30, 2026
View
Version 10
Solicitation
Posted: Apr 17, 2026
View
Version 9
Solicitation
Posted: Apr 7, 2026
View
Version 8
Solicitation
Posted: Mar 23, 2026
View
Version 7
Solicitation
Posted: Mar 6, 2026
View
Version 6
Solicitation
Posted: Mar 4, 2026
View
Version 5
Solicitation
Posted: Feb 20, 2026
View
Version 4
Solicitation
Posted: Feb 10, 2026
View
Version 3
Solicitation
Posted: Jan 28, 2026
View
Version 2
Pre-Solicitation
Posted: Jan 27, 2026
View
Version 1
Special Notice
Posted: Dec 22, 2025
View
KC-46 Landing Gear PBL | GovScope