DUNE Cold Lab - Construction of New Egress Doors and Egress Modifications

SOL #: 378077GMKSolicitation

Overview

Buyer

Energy
Energy, Department Of
FERMILAB - DOE CONTRACTOR
Batavia, IL, 60510, United States

Place of Performance

Batavia, IL

NAICS

Industrial Building Construction (236210)

PSC

Construction Of Other Industrial Buildings (Y1EZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 19, 2026
2
Last Updated
Mar 26, 2026
3
Submission Deadline
Apr 10, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

Fermi National Accelerator Laboratory (FNAL) is soliciting proposals for the Construction of New Egress Doors and Egress Modifications at the HEERC DUNE Cold Lab in Batavia, IL. This Total Small Business Set-Aside opportunity requires contractors to perform all work as defined in the Scope of Work, including an optional egress door. Proposals are due April 10, 2026, at 3:00 pm CDT.

Scope of Work

The subcontractor shall perform all work related to the installation of new egress doors and egress modifications, as detailed in the Statement of Work and all exhibits. This includes a requirement for an optional egress door. The scope encompasses transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision necessary to complete the project.

Contract & Timeline

  • Type: Solicitation (RFP)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Y1EZ (Construction Of Other Industrial Buildings)
  • Place of Performance: Batavia, IL 60510, United States
  • Pre-Proposal Meeting & Site Visit: March 25, 2026, at 09:00 AM CDT. Participants must email ginakern@fnal.gov with attendee details.
  • Questions Due: April 3, 2026
  • Proposals Due: April 10, 2026, at 3:00 pm CDT
  • Published: March 26, 2026

Submission & Contact

All questions must be submitted in writing to Gina M. Kern at ginakern@fnal.gov. Proposals, along with all required documents, should also be emailed to ginakern@fnal.gov. Contact: Gina M. Kern, ginakern@fnal.gov, 630-840-3955.

People

Points of Contact

Gina M. KernPRIMARY

Files

Files

Download

Versions

Version 2Viewing
Solicitation
Posted: Mar 26, 2026
Version 1
Solicitation
Posted: Mar 19, 2026
View
DUNE Cold Lab - Construction of New Egress Doors and Egress Modifications | GovScope