R--EL VADO ROAD CLOSURE TRAFFIC CONTROL

SOL #: 140R4026Q0020Award Notice

Overview

Buyer

Interior
Bureau Of Reclamation
UPPER COLORADO REGIONAL OFFICE
SALT LAKE CITY, UT, 84138, United States

Place of Performance

Place of performance not available

NAICS

All Other Support Services (561990)

PSC

Other Professional Services (R499)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 10, 2026
2
Last Updated
Mar 19, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Reclamation, Upper Colorado Regional Office, is soliciting proposals for El Vado Road Closure Traffic Control services. This Total Small Business Set-Aside opportunity requires a contractor to provide all necessary services and equipment for the safe closure of New Mexico State Road (NM) 112 at El Vado Dam. The purpose is to facilitate investigatory drilling operations. Offers are due by March 2, 2026, at 4:00 PM MDT.

Scope of Work

The contractor will be responsible for:

  • Acquiring an NMDOT permit and designing/approving a Traffic Control Plan (TCP).
  • Installing and maintaining NMDOT and MUTCD-compliant traffic control devices, including signage, barriers, and message boards.
  • Ensuring the Bureau of Reclamation's drilling equipment remains staged on the dam crest throughout the closure.
  • Providing final stamped TCP plans for NMDOT permit acquisition.
  • Being available onsite within 24 hours for issue resolution.
  • Note: Daily flaggers are not required, and emergency vehicles will need alternate routes. Coordination with NMDOT and local emergency services is critical.

Contract Details

  • Contract Type: Single Purchase Order Contract
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS: 561990 (All Other Support Services) with a $16.5M size standard.
  • Period of Performance: The updated period of performance is March 17, 2026, to September 30, 2026. The estimated road closure is from May 27, 2026, to September 4, 2026, with an option for one additional month of services.
  • Place of Performance: El Vado Dam, New Mexico, along NM 112. Signage placement may extend to NM 322, NM 64, and NM 96.

Submission & Evaluation

  • Offers Due: March 2, 2026, 4:00 PM MDT.
  • Questions Due: February 23, 2026, 4:00 PM MDT, via email to Valerie Jiron.
  • Submission Requirements:
    • Technical Proposal: Maximum 5 pages, covering TCP Design, earliest start date, equipment rental/subcontracting needs, warranty, and onsite availability.
    • Past Performance: Three most recent similar contracts.
    • Price: Completed Price Schedules A & B. Offers for less than the total of both schedules will be considered nonresponsive. Permit fees can be included in the "Traffic Control Plan with Stamp" line item or as separate line items.
  • Evaluation Criteria: Best value, considering Technical Capability, Past Performance, and Price. Technical and Past Performance are considered equal.

Important Notes

  • A Wage Determination (NM No 2015-5451 Rev 27) is included, outlining minimum wage rates and fringe benefits for various occupations in specific New Mexico counties. Bidders must ensure their proposed wages meet or exceed these rates.
  • A mandatory Post Award Conference is required within 7 days of award.
  • Public notices for closure dates will be provided by Reclamation.

People

Points of Contact

Jiron, ValeriePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Award Notice
Posted: Mar 19, 2026
Version 2
Solicitation
Posted: Feb 18, 2026
View
Version 1
Solicitation
Posted: Feb 10, 2026
View
R--EL VADO ROAD CLOSURE TRAFFIC CONTROL | GovScope