Electric Arc Furnace removal ,acquisition and installation

SOL #: W519TC26R028Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RI
ROCK ISLAND, IL, 61299-0000, United States

Place of Performance

Rock Island, IL

NAICS

All Other Industrial Machinery Manufacturing (333248)

PSC

Industrial Furnaces, Kilns, Lehrs, And Ovens (4430)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 29, 2026
2
Last Updated
Jun 1, 2026
3
Submission Deadline
Jun 8, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Contracting Command - Rock Island (ACC-RI) is soliciting proposals for the removal, acquisition, and installation of Electric Arc Furnaces at Rock Island, IL. This requirement includes detailed design, engineering, project management, equipment installation, construction services, commissioning, and training. The contract will be a Firm-Fixed Price (FFP) award, utilizing a Lowest Price Technically Acceptable (LPTA) source selection procedure. This acquisition is UNRESTRICTED. Proposals are due June 8, 2026, at Noon CST.

Scope of Work

This opportunity requires a contractor to provide:

  • Demolition and removal of existing 5-Ton and 3-Ton Arc furnaces.
  • Procurement and installation of one 5-Ton Electric Arc furnace, with an option for a second.
  • Procurement and installation of an optional 5-Ton Argon Oxygen Decarburization (AOD) system.
  • Procurement and installation of necessary supporting equipment, including a bag house dust collection system, and compressed air and argon storage tanks.
  • Detailed design engineering, specification development, project management, concrete work, construction services, equipment commissioning, and training.
  • All materials and labor to ensure equipment is safely operational and meets industry/national standards (e.g., OSHA, ASTM, ASME, ANSI, NEMA, NFPA).
  • Compliance with specific design standards, utility connections, safety, security, and environmental requirements.

Contract Details

  • Contract Type: Firm-Fixed Price (FFP).
  • Period of Performance: Delivery estimated by September 17, 2027, for main items.
  • Set-Aside: UNRESTRICTED. A Notice of Price Evaluation Preference for HUBZone Small Business Concerns is included.
  • NAICS Code: 333248 (Industrial Furnaces, Kilns, Lehrs, And Ovens).

Submission & Evaluation

  • Proposal Submission Deadline: June 8, 2026, 12:00 PM CST.
  • Submission Format: Electronic only, emailed to the Contract Specialist.
  • Evaluation Factors: Proposals will be evaluated on Technical Acceptability and Price. Award will be made to the lowest priced, technically acceptable offeror.
    • Technical Evaluation: Based on Experience (at least 3 years supplying/offering similar equipment) and Statement of Work/Request for Information and Purchase Description (SOW/RIPD) Compliance.
    • Price Evaluation: Firm fixed prices for all Contract Line Item Numbers (CLINs), submitted on a FOB Destination basis to Rock Island, IL 61299. Prices are binding for one year.

Key Dates & Site Visit

  • Mandatory Site Visit: May 8, 2026, at 8:00 AM. Pre-registration is required, and specific identification/access procedures must be followed.

Required Deliverables (CDRLs)

The solicitation includes a Contract Data Requirements List (CDRL) detailing numerous data items required from the contractor. These include installation documentation, tool lists, footprint drawings, machine foundation drawings, installation drawings, electrical/pneumatic/hydraulic schematics, water piping schematics, equipment identification, maintenance manuals (safety lockout, preventive maintenance), operator manuals, environmental compliance data (MSDS, chemical lists), and pre-shipment testing reports. Submission timelines vary, with some required 60 days prior to delivery and others at delivery.

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jun 1, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View