Elevator Maintenance Support for Harry S. Truman Power Plant, Warsaw, MO

SOL #: W912DQ26A058Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W071 ENDIST KANSAS CITY
KANSAS CITY, MO, 64106-2896, United States

Place of Performance

MO

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Service And Trade Equipment (J035)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 24, 2026
2
Last Updated
May 11, 2026
3
Submission Deadline
May 15, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE), Kansas City District, is soliciting proposals for Elevator Maintenance and Technical Support Services at the Harry S. Truman Power Plant in Warsaw, MO. This opportunity is a Total Small Business Set-Aside. The submission due date has been extended to May 15, 2026, at 12:00 PM EDT.

Scope of Work

The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary for comprehensive elevator maintenance and technical support. This includes:

  • Routine preventive maintenance, lubrication, adjustment, and safety device testing.
  • Annual safety inspections and testing in accordance with ASME A17.1 and state regulations, including five-year full load testing.
  • Technical support visits for evaluation, troubleshooting, and diagnosis of elevator deficiencies.
  • Maintaining elevator system documentation, including logs and inspection records.
  • Coordination with plant staff on outages and maintenance schedules. The services cover two critical elevators: a 1978, 2000 lb side-traction Hollister-Whitney 430D (6 stops) and a 1978, 4000 lb overhead traction Hollister-Whitney 530H (4 stops).

Contract Details

  • Contract Type: Firm Fixed Price (Combined Synopsis/Solicitation W912DQ26QA058)
  • Period of Performance: One base year (June 1, 2026 - May 31, 2027) and one 12-month option year (June 1, 2027 - May 31, 2028), not to exceed 24 months total.
  • Set-Aside: Total Small Business (NAICS 238990, Size Standard $19,000,000.00)
  • Place of Performance: Harry S. Truman Power Plant, Warsaw, MO.

Submission & Evaluation

  • Response Due: May 15, 2026, 12:00 PM EDT.
  • Submission Method: Offers must be submitted in PDF format via email to angella.curran@usace.army.mil.
  • Required Documents: Completed SF 1449, pricing for all CLINs, Vendor Information Sheet, Related Experience Form (1-3 relevant projects), and a Past Performance Questionnaire (PPQ) completed by clients. Offers must be valid for at least 90 days.
  • Evaluation Factors: Price, Relative Experience, and Past Performance. Award will be made to the most advantageous offer.
  • Site Visit: Highly encouraged but not required. To schedule, contact Mr. Seth Chiles at Seth.C.Chiles@usace.army.mil or (816) 389-3744.

Special Requirements

Contractor personnel must possess current elevator technician certifications (e.g., NAEC), state inspector licenses, and OSHA safety training. Compliance with EM 385-1-1 and ASME A17.1 is mandatory. Offerors must be registered and active in SAM.gov.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: May 11, 2026
Version 2
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
View
Elevator Maintenance Support for Harry S. Truman Power Plant, Warsaw, MO | GovScope