EWP 5087-001 Elkhorn Site & Northfork Church Site in McDowell County, West Virginia
SOL #: 12FPC326B0002Combined Synopsis/Solicitation
Overview
Buyer
Agriculture
Farm Production And Conservation Business Center
FPAC BUS CNTR-ACQ DIV
WASHINGTON, DC, 20250, United States
Place of Performance
WV
NAICS
Other Heavy and Civil Engineering Construction (237990)
PSC
Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Apr 8, 2026
2
Last Updated
May 4, 2026
3
Submission Deadline
May 5, 2026, 5:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Natural Resources Conservation Service (NRCS) is soliciting bids for erosion control construction services at the Elkhorn Site & Northfork Church Site in McDowell County, West Virginia. This Firm Fixed Price contract, valued between $200,000 and $250,000, is a 100% Total Small Business Set-Aside. Bids are due by May 5, 2025, at 12:00 p.m. CST.
Scope of Work
This project, under the Emergency Watershed Protection (EWP) program, requires comprehensive erosion control measures. Key tasks include:
- Laying wire mesh gabions and grouted rock riprap.
- Preparing foundations on shallow bedrock.
- Rebar anchoring and riprap foundation protection.
- Channel clearing and shaping, pollution control, excavation, earthfill, drainfill, rockfill, steel reinforcement, plastic pipe, and geotextile installation.
- Compliance with detailed construction drawings, specifications, and prevailing wage rates (Davis Bacon).
- Adherence to OSHA standards and NRCS safety supplements, requiring a comprehensive safety program.
Contract Details & Requirements
- Contract Type: Firm Fixed Price Commercial Services Contract.
- Estimated Value: $200,000 - $250,000.
- Period of Performance: Construction completion by July 31, 2026. The entire work must be completed within 50 calendar days after the Notice to Proceed.
- Set-Aside: 100% Total Small Business.
- NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) with a $45.0 million size standard.
- Bonds: A 20% bid bond is required. A Payment Bond (SF-25A), Irrevocable Letter of Credit (ILC), or Tripartite Escrow Agreement for 100% of the project cost is required within 10 calendar days of award.
- Specifics: Contractors must bid for rebar anchoring and foundation preparation as if needed, with final determination by the NRCS Engineer. Strict guidelines apply to dewatering, concrete testing, and grout placement to prevent stream contamination.
Submission & Evaluation
- Bids Due: May 5, 2025, by 12:00 p.m. CST. Bids must be submitted electronically via email to mark.domingo@usda.gov.
- Questions Due: April 28, 2026, by 12:00 p.m. CST.
- Site Visit: A strongly urged site visit is scheduled for April 21, 2026, at 10:30 AM EST. Attendees will meet at a nearby church.
- Eligibility: Interested contractors must be registered in the System for Award Management (SAM.gov).
- Evaluation: Award will be made to the responsible bidder whose bid is most advantageous to the Government, considering only price. Bids that are materially unbalanced or unrealistically low may be rejected.
Contact Information
- Primary Contact: Mark Domingo (mark.domingo@usda.gov).
People
Points of Contact
Mark DomingoPRIMARY
Files
Versions
Version 9
Combined Synopsis/Solicitation
Posted: May 4, 2026
Version 8
Combined Synopsis/Solicitation
Posted: May 4, 2026
Version 7Viewing
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
Version 6
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 8, 2026