EWP 5087-001 Elkhorn Site & Northfork Church Site in McDowell County, West Virginia

SOL #: 12FPC326B0002Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Farm Production And Conservation Business Center
FPAC BUS CNTR-ACQ DIV
WASHINGTON, DC, 20250, United States

Place of Performance

WV

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 8, 2026
2
Last Updated
May 4, 2026
3
Submission Deadline
May 5, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Natural Resources Conservation Service (NRCS) is soliciting bids for erosion control construction services at the Elkhorn Site & Northfork Church Site in McDowell County, West Virginia. This Firm Fixed Price contract, valued between $200,000 and $250,000, is a 100% Total Small Business Set-Aside. The project involves streambank stabilization under the Emergency Watershed Protection (EWP) program. Bids are due May 5, 2025.

Scope of Work

The contractor will provide construction services for erosion control measures, including:

  • Laying wire mesh gabions and grouted rock riprap.
  • Preparing foundations on shallow bedrock.
  • Rebar anchoring and riprap foundation protection.
  • Compliance with OSHA standards and the NRCS Supplement to OSHA Parts 1910 and 1926.
  • Implementation of a comprehensive safety program. Detailed engineering drawings, construction notes, and specifications are provided in attachments, outlining specific materials, quantities, and construction methods for the streambank stabilization.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Estimated Value: $200,000 - $250,000
  • Period of Performance: Construction completion by July 31, 2026.
  • Product Service Code: Y1QA (Construction Of Restoration Of Real Property)
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction)
  • Size Standard: $45.0 million average annual revenue.

Submission & Evaluation

  • Bids Due: May 5, 2025, by 12:00 p.m. CST.
  • Submission Method: Electronically via email to mark.domingo@usda.gov.
  • Questions Due: April 28, 2026, by 12:00 p.m. CST.
  • Evaluation Criteria: Award will be made to the responsible bidder whose bid conforms to the solicitation and is most advantageous to the Government, considering only price. Bids may be rejected if materially unbalanced or unrealistically low.

Eligibility & Requirements

  • This acquisition is a 100% Total Small Business Set-Aside.
  • Contractors must be registered in the System for Award Management (SAM.gov).
  • A bid bond in the amount of 20% of the bid price is required.
  • A Payment Bond (SF-25A), Irrevocable Letter of Credit (ILC), or Tripartite Escrow Agreement for 100% of the project cost is required within 10 calendar days of award.
  • Compliance with prevailing wage rates, as detailed in the attached Wage Determination, is mandatory.

Key Dates & Contact

  • Site Visit: April 21, 2026, at 10:30 AM EST. Attendance is strongly urged.
  • Contact: Mark Domingo, mark.domingo@usda.gov
  • Published Date: April 9, 2026.

People

Points of Contact

Mark DomingoPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View