EWP 5087-001 Elkhorn Site & Northfork Church Site in McDowell County, West Virginia

SOL #: 12FPC326B0002Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Farm Production And Conservation Business Center
FPAC BUS CNTR-ACQ DIV
WASHINGTON, DC, 20250, United States

Place of Performance

WV

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 8, 2026
2
Last Updated
May 4, 2026
3
Submission Deadline
May 5, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Natural Resources Conservation Service (NRCS) is seeking construction services for Emergency Watershed Protection (EWP) erosion control at the Elkhorn Site & Northfork Church Site in McDowell County, West Virginia. This Firm Fixed-Price contract, valued between $200,000 and $250,000, is a Total Small Business Set-Aside. Bids are due May 5, 2026.

Scope of Work

This opportunity involves critical erosion control measures to stabilize streambanks. Key tasks include:

  • Laying wire mesh gabions.
  • Preparing foundations on shallow bedrock.
  • Rebar anchoring.
  • Riprap foundation protection, including grouted rock riprap. The project requires compliance with OSHA standards and NRCS safety supplements. Detailed engineering drawings and construction notes are provided in Attachment 2, outlining specific locations, materials, quantities, and construction methods.

Contract Details

  • Contract Type: Firm Fixed-Price.
  • Estimated Value: $200,000 - $250,000.
  • Period of Performance: Construction completion by July 31, 2026. Delivery by February 25, 2026.
  • Set-Aside: 100% Total Small Business Set-Aside.
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) with a $45.0 million size standard.
  • Bonds: A 20% bid bond is required. A Payment Bond (SF-25A), Irrevocable Letter of Credit (ILC), or Tripartite Escrow Agreement for 100% of the project cost is required within 10 calendar days of award.

Submission & Evaluation

  • Bids Due: May 5, 2026, by 12:00 p.m. CST.
  • Questions Due: April 28, 2026, by 12:00 p.m. CST.
  • Submission Method: Electronically via email to mark.domingo@usda.gov.
  • Evaluation: Award will be made to the responsible bidder whose bid is most advantageous to the Government, considering only price. The government may reject materially unbalanced or unrealistically low bids.
  • Eligibility: Contractors must be registered in SAM.gov.

Important Notes

  • A site visit is strongly urged and will be held on April 21, 2026, at 10:30 AM EST.
  • Wage Determination (Attachment 3) specifies minimum wage rates and fringe benefits for various occupations in West Virginia counties, including McDowell. Bidders must ensure compliance with these rates.
  • The project is part of an Emergency Watershed Protection Program (EWPP) with an estimated total construction cost of $268,043, funded 90% by NRCS and 10% by the West Virginia Conservation Agency.

People

Points of Contact

Mark DomingoPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View