FCI Oxford Install Water Softener

SOL #: 15BBNF26Q00000039Combined Synopsis/Solicitation

Overview

Buyer

Justice
Federal Prison System / Bureau Of Prisons
FAO
GRAND PRAIRIE, TX, 75051, United States

Place of Performance

Oxford, WI

NAICS

Water Supply and Irrigation Systems (221310)

PSC

Repair Or Alteration Of Penal Facilities (Z2FF)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 10, 2026
2
Last Updated
Mar 19, 2026
3
Submission Deadline
Apr 2, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Bureau of Prisons (FBOP), Federal Correctional Institution (FCI) Oxford, is soliciting proposals for the installation of a new centralized water softener system at its facility in Oxford, Wisconsin. This acquisition is a 100% Women-Owned Small Business (WOSB) / Economically Disadvantaged Women-Owned Small Business (EDWOSB) Set-Aside. Proposals are due by April 02, 2026, at 4:00 PM ET.

Scope of Work

This project requires a responsible entity to provide all necessary equipment, labor, materials, and incidentals to remove existing water softeners and install a new centralized water softener for the entire institution. Key requirements include:

  • Removal and proper disposal of existing water softeners.
  • Replacement of piping to create a bypass around former locations.
  • Procurement and installation of a new commercial-grade centralized water softener system, sized for the facility's domestic water demand.
  • Specific system components: three 48"x72" fiberglass tanks, 120 cu ft of high-capacity cation resin, specific sub-fill, three Fleck 3900 control valves with NXT 2 Controls, and three 3" Clack stainless steel flow meters.
  • The system must be set up as a progressive flow system.
  • Installation must adhere to all Federal, National, and local guidelines, codes, and regulations, including seismic zone requirements, environmental compliance, Life Safety, NFPA, and ADA-ABA.
  • Contractor responsibilities include maintaining a clean site, daily debris removal, proper waste disposal, and ensuring security clearances for all personnel.
  • FBOP will provide water and 120-volt circuits; the contractor is responsible for all other equipment and materials.
  • Work hours are typically Monday-Friday, 7:00 AM - 3:00 PM.

Contract Details

  • Type: Combined Synopsis/Solicitation (Firm Fixed Price)
  • Estimated Value: Between $250,000.00 and $500,000.00
  • Set-Aside: 100% Women-Owned Small Business (WOSB) / Economically Disadvantaged Women-Owned Small Business (EDWOSB)
  • Product Service Code: Z2FF (Repair Or Alteration Of Penal Facilities)
  • Place of Performance: FCI Oxford, Oxford, WI 53952

Submission & Evaluation

  • Offer Due Date: April 02, 2026, at 4:00 PM ET.
  • Submission Method: Email proposals to rcalandra@bop.gov.
  • Required Submissions:
    1. Completed SF1449 (solicitation) with blocks 17a, 30a, 30b, 30c, and Page 4 filled in (including Name, Email, UEI, Phone Number).
    2. Completed SF24 Bid Bond (can be emailed; seal must be visible).
    3. A summary of the technical process for completing the work, in accordance with the Statement of Work.
  • Evaluation: Lowest Price Technically Acceptable (LPTA) source selection process per FAR 15.101-2. Offers must clearly separate the three required items; missing items will result in an unresponsive offer.

Pre-bid Site Visit

A pre-bid site visit is scheduled for March 18, 2026, at 9:00 AM, meeting at the Front Lobby of FCI Oxford, County Road G & Elk Avenue, Oxford, WI 53952. No NCIC clearances are needed, and multiple representatives may attend. For site visit information, email oxf-facilities-s@bop.gov.

Additional Notes

Bidders must consult the attached Wage Determination (WI20260015) for prevailing wage rates and fringe benefits. For questions, contact Ronald Calandra at 843-387-9424 or rcalandra@bop.gov.

People

Points of Contact

ronald calandraPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Combined Synopsis/Solicitation
Posted: Mar 19, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 10, 2026
View
FCI Oxford Install Water Softener | GovScope