Fire Suppression Repair Labor Mtn Bridge Repair

SOL #: 1240BJ26Q0016Pre-Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA NORTHWEST 7
Portland, OR, 972042829, United States

Place of Performance

Wenatchee, WA

NAICS

Highway (237310)

PSC

Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways (Z2LB)

Set Aside

No set aside specified

Timeline

1
Posted
Jun 4, 2026
2
Response Deadline
Jun 10, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is issuing a BPA Call for Fire Suppression Repair involving the replacement of treated timber bridge running planks. This work is required due to damage from the Labor Mountain Wildfire on the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest in Chelan County, Washington. This is not a request for quotes open to the general public; it is a competitive call under the established “Region 6 – Northwest Facilities Maintenance and Construction BPA”, and additional contractors will not be considered. This notice is for informational purposes only.

Scope of Work

The primary service required is the replacement of treated timber bridge running planks. This repair is necessary to address damage sustained during fire suppression efforts related to the Labor Mountain Wildfire. The work will be performed within the Wenatchee River Ranger District.

Contract & Timeline

  • Type: BPA Call under an existing Blanket Purchase Agreement (BPA)
  • Existing BPA: “Region 6 – Northwest Facilities Maintenance and Construction BPA”
  • Product/Service Code: Z2LB (Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways)
  • Place of Performance: Wenatchee River Ranger District, Okanogan-Wenatchee National Forest, Chelan County, Washington.
  • Response Date (for existing BPA holders): June 10, 2026
  • Published: June 4, 2026

Set-Aside

Not applicable. This is a competitive BPA Call restricted to existing holders of the "Region 6 – Northwest Facilities Maintenance and Construction BPA."

Additional Notes

This notice serves as an informational announcement for existing BPA holders and is not a request for quotes from new or additional contractors. Interested parties must already be established under the specified BPA to be considered. For inquiries, contact Traci Jackson at Traci.jackson@usda.gov.

People

Points of Contact

Traci JacksonPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Pre-Solicitation
Posted: Jun 4, 2026
Fire Suppression Repair Labor Mtn Bridge Repair | GovScope