FORREST SHERMAN FY26 DMP 38N
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / Mid Atlantic Regional Maintenance Center (MARMC) has issued a Justification and Approval (J&A) for other than full and open competition for shipyard support services on the USS FORREST SHERMAN (DDG 98). This J&A pertains to additional work under an existing contract, N00024-26-C-4403, previously awarded to BAE Systems, Norfolk, VA. The work involves the installation of a Rudder Anechoic Tile system (RCC 38N).
Scope of Work
The procurement covers shipyard support services for the installation of the Rudder Anechoic Tile system (RCC 38N) on the USS FORREST SHERMAN (DDG 98). This work is in accordance with Specification Item 993-21-002 and is funded by Fiscal Year 2026 Other Procurement, Navy (OPN) funds. The work must commence no later than a redacted date to allow the Prime Contractor to integrate it into the existing work package.
Contract Details
- Contract Number: N00024-26-C-4403
- Awarded To: BAE Systems, Norfolk, VA
- Contract Type: Firm Fixed Price
- Estimated Value: [Redacted]
- Funding: FY2026 Other Procurement, Navy (OPN) funds
- Place of Performance: Norfolk, VA
Eligibility / Set-Aside
This procurement is being conducted using other than full and open competition under 10 U.S.C. 3204(a)(1) and FAR 6.302-1(a)(2), citing an "unusual and compelling urgency." Therefore, it is a sole-source justification, and no new bids are being solicited.
Additional Notes
The justification states that failure to complete this work could result in unacceptable delays and prevent the ship from meeting its scheduled operational commitments. Due to the critical nature and immediate need, market research was not conducted. The Government intends to review future acquisitions for similar work to ensure fair competition opportunities. The notice was published on March 31, 2026, with the J&A document posted on April 8, 2026.
Contact Information
Primary Point of Contact: Sean Breaux (sean.d.breaux2.civ@us.navy.mil, 757-837-8914)