Fort Collins Road Repairs, NIST, Boulder, CO

SOL #: 1333ND26QNB190276Combined Synopsis/Solicitation

Overview

Buyer

Commerce
National Institute Of Standards And Technology
DEPT OF COMMERCE NIST
GAITHERSBURG, MD, 20899, United States

Place of Performance

Boulder, CO

NAICS

Highway (237310)

PSC

Maintenance Of Miscellaneous Buildings (Z1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 11, 2026
2
Submission Deadline
Jul 28, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Institute of Standards and Technology (NIST), under the Department of Commerce, is soliciting proposals for Fort Collins Road Repairs at its Boulder, CO campus. This Firm-Fixed-Price (FFP) contract is a Total Small Business Set-Aside for comprehensive roadway improvements, asphalt repairs, and surface treatments. Offers are due by July 28, 2026, at 3:00 PM MT.

Scope of Work

The contractor will provide all labor, materials, equipment, supervision, and transportation necessary to complete roadway improvements, asphalt repairs, and surface treatments. Key requirements include:

  • Entrance Road Improvements: Supply and install road base material, regrade roadway for proper drainage and crown, and water/compact subgrade and base materials.
  • Asphalt Repairs and Maintenance: Crack sealing (1.5" wide or greater), major crack repair (approximately 220 linear feet), concrete drain pan replacement (approximately 20 SF), and applying flexible sealant where asphalt separates from buildings.
  • Surface Treatment: Applying slurry seal to approximately 50,000 SF of designated roadway and parking areas.
  • Traffic Control: Providing and maintaining traffic control throughout the project.
  • General Requirements: Protecting existing infrastructure, repairing any damage caused by construction, and ensuring work meets industry standards. A site-specific Safety Plan is required within 10 days of award.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP)
  • Period of Performance: 180 calendar days from Notice to Proceed (NTP).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237310 (Highway, Street, and Bridge Construction)
  • Small Business Size Standard: $45.0 Million

Submission & Evaluation

  • Offers Due: July 28, 2026, by 3:00 PM MT.
  • Pre-Proposal Conference: July 15, 2026, at 1:30 PM MT.
  • Questions Due: July 21, 2026, by 3:00 PM MT.
  • Evaluation Factors: Technical Approach, Schedule, Past Performance, and Price. Technical Approach, Schedule, and Past Performance combined are more important than Price.

Additional Notes

The place of performance is the NIST Fort Collins Campus. Regular business hours are Monday through Friday, 7 am to 6 pm Mountain Time. Award is subject to the City of Boulder Sales/Use Tax. Offerors must acknowledge receipt of any amendments.

People

Points of Contact

Shawn BorisowPRIMARY

Files

Files

Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jun 11, 2026
Fort Collins Road Repairs, NIST, Boulder, CO | GovScope