Fort Peck Area Mowing and Trimming - Tract Descriptions: Powerplant, Interpretive Center and Administration Building
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Omaha District, is soliciting proposals for non-personal lawn maintenance services at the Fort Peck Dam Area in Fort Peck, Montana. This Total Small Business Set-Aside opportunity covers mowing, trimming, and debris removal for the Powerplant, Interpretive Center, and Administration Building tracts. The contract is a Firm Fixed-Price award with a base year and four option years. Offers are due April 15, 2026.
Scope of Work
The contractor will provide comprehensive grounds maintenance, including mowing, bagging clippings, trimming, and removing trash, tree limbs, and pinecones from designated areas. The services are performance-based, requiring adherence to specific standards such as mowing height (3.5" to 4.5") and uniform appearance. Work is generally required weekly during active periods (May through November) across three main tracts:
- Tract 1: Power Plant (~2.8 acres)
- Tract 2: Interpretive Center (~0.72 acres)
- Tract 3: Administration Building (~3.37 acres)
Contract Details
- Contract Type: Firm Fixed Price
- Set-Aside: Total Small Business (NAICS 561730, $9.5M size standard)
- Period of Performance: One Base Year (May 1, 2026 - April 30, 2027) and four 12-month Option Years, extending the potential contract duration through April 30, 2031. Active performance periods are typically May through November, with inactive periods from December through April.
- Place of Performance: Fort Peck Dam Area, Fort Peck, Montana 59255
Submission & Evaluation
- Offer Due Date: April 15, 2026, at 02:00 PM local time.
- Submission Instructions: Offers must be submitted electronically as a single PDF document (not exceeding 25 pages, excluding the price worksheet) to Ms. Jacqueline Posey (jacqueline.n.posey@usace.army.mil) and Mr. Marc Proietto (marc.proietto@usace.army.mil).
- Evaluation Factors: Proposals will be evaluated based on Technical capabilities, Past Performance, and Price. Technical and Past Performance, when combined, are considered more important than Price. Technical submissions require a narrative of abilities and an equipment list, while Past Performance requires two references for similar mowing services within the last three years.
- Questions: All questions must be submitted in writing to Ms. Jacqueline Posey no later than seven (7) calendar days prior to the offer due date.
Special Requirements & Notes
Bidders must comply with specific safety regulations (EM 385-1-1, OSHA), environmental protection guidelines, and insurance requirements (Worker's Compensation, General Liability, Automobile Liability). Required submittals include a Work Plan, Quality Control Plan, and Safety Procedures. Contractors must provide all equipment and ensure two employees are CPR/First-Aid certified. A Wage Determination under the Service Contract Act is applicable, outlining minimum wage rates and fringe benefits for the region. While no formal site visit is scheduled, offerors are invited to arrange their own.