Fort Thompson Intake/Pumphouse Construction
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE) Omaha District sought bids for the Fort Thompson Intake/Pumphouse Construction project, a Total Small Business Set-Aside. This Two-Step Invitation for Bid (IFB) involved constructing a wet well, water intake, and pump house at Lake Sharpe, Fort Thompson, SD. Bids were due and opened on May 8, 2026.
Scope of Work
The project required the construction of a new raw water intake system and a new pump house. This included mobilization, construction of the pumphouse and its components, waterline installation, and seeding/demobilization. Technical specifications detailed requirements for an engine-generator set system, safety systems, and extensive testing. An amendment (Am-0001) revised specifications for vertical turbine pumps.
Contract Details
- Contract Type: Firm Fixed-Price
- Estimated Magnitude: Between $5,000,000 and $10,000,000
- Period of Performance: 365 calendar days after Notice to Proceed (NTP)
- NAICS Code: 237990 (Other Heavy and Civil Engineering Construction)
- Size Standard: $45,000,000
- Place of Performance: Fort Thompson, SD
Procurement Process & Evaluation
This opportunity utilized a Two-Step Sealed Bidding method (FAR Part 14.5). The process combined competitive procedures to ensure only technically acceptable firms participated in the priced sealed bid.
- Step One: Technical proposals were submitted and evaluated for acceptability, without pricing information. Firms advancing to Step Two included Dean Kurtz Construction, Engineering & Construction Innovations, Inc., Greenstone Construction, Inc., and Sentry.
- Step Two: Priced bids were submitted by the technically acceptable firms. Bid bonds were required with Step Two submissions, and Payment and Performance Bonds will be required at contract award.
Key Dates
- Bid Due & Opening: May 8, 2026
- Site Visit: February 10, 2026 (email confirmation required)
Important Notes
Contractors were required to be registered and have active, verified accounts in the System for Award Management (SAM) with NAICS Code 237990 included in their profile. Wage Determinations (SD20260001 and SD20260032) were applicable, outlining prevailing wage rates and fringe benefits. Past Performance Questionnaires (Form PPQ-0) were also part of the submission requirements.
Contact Information
- Primary Point of Contact: Sam McGuffey (sam.k.mcguffey@usace.army.mil, 402-995-2077)
- Secondary Point of Contact: Jeffrey Wyant (jeffrey.w.wyant@usace.army.mil, 402-995-2071)
- All questions were to be submitted via ProjNet.