Frog Switch - Carlisle PA - Supplemental Phase II Environmental Site Assessment

SOL #: 6913G626Q300023Solicitation

Overview

Buyer

Transportation
Office Of The Secretary
6913G6 VOLPE NATL. TRANS. SYS CNTR
CAMBRIDGE, MA, 02142, United States

Place of Performance

Carlisle, PA

NAICS

Site Preparation Contractors (238910)

PSC

Other Environmental Services, Studies, And Analytical Support (F999)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 6, 2026
2
Last Updated
Apr 15, 2026
3
Submission Deadline
May 4, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Transportation, Volpe National Transportation Systems Center, is soliciting quotes for a Supplemental Phase II Environmental Site Assessment (ESA) at the former Frog, Switch & Manufacturing Company site in Carlisle, Pennsylvania. This Total Small Business Set-Aside opportunity requires a Pennsylvania-licensed driller to conduct drilling activities and soil sampling to further characterize existing soil contamination and establish background arsenic levels. Quotes are due by May 4, 2026, at 11:00 AM EST.

Scope of Work

The primary objective is to delineate areas of soil contamination (metals and polycyclic aromatic hydrocarbons) and collect background arsenic samples. Key tasks include:

  • Advancing 35-45 soil borings to a depth of 15 feet below ground surface (bgs).
  • Collecting 2-inch cores for logging, volatile screening, and sampling by Volpe personnel.
  • Backfilling completed borings and patching/sealing through concrete floors.
  • Providing three 55-gallon steel drums for potential disposal of contaminated soil cuttings.
  • Adhering to detailed Field Sampling Plan (FSP) procedures for sample collection, analysis (metals, SVOCs), and Quality Assurance/Quality Control (QA/QC).
  • Following Standard Operating Procedures (SOPs) for site access and utility clearance, including 811 services and private utility locators.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price Purchase Order.
  • Period of Performance: Date of award to July 31, 2026.
  • NAICS Code: 238910 (Small Business Size Standard: $16.5M).
  • Questions Due: April 14, 2026, 1:00 PM EST.
  • Quotes Due: May 4, 2026, 11:00 AM EST.
  • Contact: Roland Regan (roland.regan@dot.gov).

Submission & Evaluation

Offerors must submit a written proposal (maximum 2 pages, excluding resumes/certifications) including:

  • Evidence of being a Pennsylvania certified/licensed driller with relevant experience.
  • Proof of certification/license and resumes of personnel.
  • A brief write-up on the proposed task performance, personnel, and equipment.
  • A minimum of two relevant references/past performance reports from the last two years.
  • A schedule for the work.

Award will be based on a "Best Value" determination, with technical factors considered more important than price. Evaluation priority is: 1) Experience, past performance, and technical proposal; 2) Schedule; 3) Price. Registration and current status in the System for Award Management (SAM) database is mandatory for award.

Special Requirements

  • Contractor must be a Pennsylvania licensed driller.
  • A Work Plan, including a Site Safety and Health Plan and Risk Management Plan, is required within five business days of the kickoff meeting.
  • All activities must be coordinated through the Contracting Officer's Representative (COR).
  • Contractor travel costs must be included in line item pricing.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 3
Solicitation
Posted: Apr 15, 2026
View
Version 2Viewing
Solicitation
Posted: Apr 7, 2026
Version 1
Solicitation
Posted: Apr 6, 2026
View