Ft. Campbell Rectifier Replacement

SOL #: W912QR-26-R-A017Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST LOUISVILLE
LOUISVILLE, KY, 40202-2230, United States

Place of Performance

Fort Campbell, KY

NAICS

All Other Miscellaneous Electrical Equipment and Component Manufacturing (335999)

PSC

Installation Of Equipment: Electrical And Electronic Equipment Components (N059)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 5, 2026
2
Last Updated
May 5, 2026
3
Submission Deadline
May 8, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, U.S. Army Corps of Engineers (USACE) Louisville District, is soliciting proposals for a turnkey Rectifier Replacement Project at Fort Campbell, KY. This project involves replacing obsolete DC power plant systems, including rectifiers and inverters, which are past their useful service life. Proposals are due May 8, 2026, at 11:00 AM ET.

Scope of Work

The selected contractor will provide all necessary personnel, equipment, tools, materials, supervision, and transportation for a complete replacement solution. Key tasks include:

  • Furnishing and installing new inverter modules, DC disconnects, AC conduits, conductors, and circuit breakers.
  • Furnishing and installing new rectifiers, RPM modules, and battery monitoring probes.
  • Transferring power connections from existing to new systems.
  • Disconnecting and removing existing rectifier and inverter components.
  • Performing initial acceptance testing.
  • Providing shop drawings and product data for review. Work will be performed across seven buildings at Ft. Campbell RNEC: 95, 2579, 6079, 6642, 7030, B7254, and 7943.

Contract Details

  • Contract Type: Firm Fixed Price
  • NAICS Code: 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing (Size Standard: 600 employees)
  • Set-Aside: Unrestricted
  • Period of Performance: 365 days from Notice to Proceed (NTP).
  • Estimated Cost: Between $1,000,000.00 and $5,000,000.00.

Key Requirements & Qualifications

  • Minimum 10 years of experience installing similar DC Plant/Inverter systems.
  • Minimum 5 years of experience with high-reliability, data center environments (Tier III or IV).
  • Contractor must have an active registration in SAM.gov, Federal Tax ID, and Unique Entity Identifier.
  • Compliance with the Service Contract Act (SCA) wage determinations for the specified geographic areas.
  • Compliance with NIST SP 800-171 for Controlled Unclassified Information (CUI).
  • Work hours are 0730 to 1600 EDT, Monday through Friday, with specific safety and security protocols (e.g., EM 385-1-1, escorted access, AT Level I, OPSEC Level I, iWATCH training).

Submission & Evaluation

  • Proposal Due Date: May 8, 2026, at 11:00 AM ET.
  • Evaluation Basis: Lowest Price (updated by Amendment 0003).
  • Submission Requirements: Completed Representations and Certifications and the Price Breakout Schedule.

Important Notes

  • A site visit was held on April 15, 2026.
  • All work, labor, and equipment are subject to a 1-year warranty from completion.
  • Contact Shanaye Davis at shanaye.s.davis@usace.army.mil for contractual questions.

People

Points of Contact

Shanaye DavisPRIMARY
THOMAS NAUERTSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7Viewing
Solicitation
Posted: May 5, 2026
Version 6
Solicitation
Posted: May 1, 2026
View
Version 5
Solicitation
Posted: Apr 23, 2026
View
Version 4
Solicitation
Posted: Apr 20, 2026
View
Version 3
Solicitation
Posted: Apr 9, 2026
View
Version 2
Solicitation
Posted: Apr 3, 2026
View
Version 1
Solicitation
Posted: Mar 5, 2026
View
Ft. Campbell Rectifier Replacement | GovScope