FTQW261406 Replace Upper Dgst Compressors

SOL #: 261406Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA5004 354 CONS PK
EIELSON AFB, AK, 99702-2200, United States

Place of Performance

Eielson AFB, AK

NAICS

Engineering Services (541330)

PSC

Other Architect And Engineering Services (C219)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 4, 2026
2
Last Updated
Mar 25, 2026
3
Response Deadline
Apr 8, 2026, 5:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, 354th Eielson Contracting Squadron, is seeking Architect-Engineer (A-E) services for the design of the replacement of upper digester compressors 1 & 2 at the Wastewater Treatment Plant (WWTP) at Eielson AFB, Alaska. This is a Presolicitation for a Total Small Business Set-Aside. Qualification packages, including SF-330 and Past Performance Questionnaires, are due by April 8, 2026, at 5:30 PM AKDT.

Scope of Work

The A-E services encompass the design phase for replacing inoperable upper digester compressors. This includes:

  • Assessment of existing compressors, piping, and related appurtenances.
  • Collection and review of project data and records.
  • Evaluation of alternatives and development of design concepts.
  • Production of comprehensive construction documents (drawings, schedules, specifications, cost estimates).
  • Design must address extreme Arctic conditions, upgrade motor conductors, re-route piping, and integrate new blowers into the SCADA system.
  • Provisions for abatement and disposal of hazardous materials are required, utilizing the provided "WWTP Hazardous Materials Assessment, Nov 2024" report.

Key Requirements

Offerors must demonstrate:

  • Specialized Experience: DoD facility design/investigations and Wastewater Treatment Plant design, particularly in Alaska.
  • Key Personnel: Mechanical Engineer, Electrical Engineer, Project/Program Manager (with remote/challenging environment experience), Industrial Hygienist, and Cost Estimator.
  • Relevant Projects: Up to 10 example projects from the last seven years, relevant to the scope, size, and location.

Contract & Timeline

  • Contract Type: Architect-Engineer Services (Presolicitation)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Design Schedule: 100% design delivery required within 125 calendar days from Notice to Proceed. Intermediate reviews at 65% and 95%.
  • Response Due Date: April 8, 2026, 5:30 PM AKDT
  • Published Date: March 25, 2026

Evaluation Criteria

Evaluation will follow The Brooks Act and FAR Subpart 36.6, using a Combined Technical/Risk Rating Method. Key factors include:

  • Professional Qualifications
  • Specialized Experience and Technical Competence
  • Capacity to perform
  • Past Performance (relevancy assessed)
  • Geographic Proximity (advantageous for firms with Alaska presence or disciplines) Discussions will be held with the top three firms, and pricing will be requested from the highest-ranked firm.

Submission Instructions

Interested firms must submit a complete electronic qualification package including:

Additional Notes

The project involves potential hazardous materials (asbestos, lead, PCBs, mercury) identified in the WWTP Hazardous Materials Assessment. Bidders should review this document and the EPA SOP for PCB sampling. Government-furnished information includes the Hazardous Material Assessment, Eielson AFB Division 1 Specifications, and Digester As-Builts.

People

Points of Contact

SrA Christopher PrinceSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Pre-Solicitation
Posted: Mar 25, 2026
Version 3
Pre-Solicitation
Posted: Mar 9, 2026
View
Version 2
Pre-Solicitation
Posted: Mar 6, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 4, 2026
View
FTQW261406 Replace Upper Dgst Compressors | GovScope