Furnishing and Installation of Oil Shaft Seal for Chiller 1 at B6582-JBSA Lackland
SOL #: FA301626Q0094Combined Synopsis/Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Air Force
FA3016 502 CONS CL
JBSA LACKLAND, TX, 78236-5286, United States
Place of Performance
DWG, TX
NAICS
Plumbing (238220)
PSC
Maintenance, Repair And Rebuilding Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment (J041)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
May 11, 2026
2
Submission Deadline
Jun 1, 2026, 5:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting quotes for the furnishing and installation of an oil shaft seal for Chiller 1 at Building 6582, JBSA-Lackland, TX. This requirement is a 100% Total Small Business Set-Aside. The project involves the complete removal, disposal, and replacement of the existing oil shaft seal with an OEM-approved component. Quotes are due by June 1, 2026, at 12:00 PM CDT.
Scope of Work
The contractor shall provide all supervision, labor, transportation, materials, tools, incidentals, equipment, and quality assurance necessary for the project. Key tasks include:
- Removal and Disposal: Carefully remove the existing oil shaft seal, taking precautions to avoid damage, and properly dispose of the old seal and contaminated materials according to local regulations.
- Installation: Install a new, OEM-approved oil shaft seal compatible with the existing York Model YKFTFT-CMGS chiller. Documentation of OEM approval and a 5-year full warranty (covering units, labor, and installation) are required.
- Testing and Cleanup: Conduct a thorough leak test after installation and document results. Clean the work area upon completion, removing all debris and tools.
- Coordination: Coordinate scheduling with facility personnel to minimize disruption, including lockout/tagout procedures and safety precautions. A 10-day notice is required for government coordination.
Contract Details
- Opportunity Type: Combined Synopsis/Solicitation
- Set-Aside: Total Small Business (FAR 19.5)
- NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning Contractors), Size Standard: $19M
- PSC: J041 (Maintenance, Repair And Rebuilding Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment)
- Place of Performance: JBSA-Lackland, Building 6582, DWG, TX 78236
- Performance Period: Estimated 5 calendar days, Monday through Friday, 7:00 AM to 5:00 PM.
Key Dates & Actions
- Questions Due: May 21, 2026, by 12:00 PM CDT. Submit in writing via email.
- Site Visit: Highly recommended on May 19, 2026, at 10:00 AM CDT. Meeting at JBSA Lackland Luke Gate (2602 Luke Blvd, Lackland TX 78236). Arrive 30 minutes early for base access, requiring a valid REAL ID Driver’s License (or passport + driver's license), vehicle registration, and insurance.
- Quotes Due: June 1, 2026, by 12:00 PM CDT.
Special Requirements & Notes
- Wage Determination: Service Contract Act (SCA) Wage Determination No. 2015-5253, Revision 29, applies, outlining minimum wage rates and fringe benefits for various occupations in the specified Texas counties. Bidders must account for these labor costs.
- Compliance: All work must comply with CEO Contract Specifications, Uniform Building Codes, Air Force Base Regulations, and OSHA Requirements.
- HAZMAT: Contractor employees must comply with base traffic regulations and report HAZMAT usage to the HAZMAT Pharmacy, including AF Form 3952, MSDS, and monthly usage reports.
- Waste Disposal: Contractor is responsible for storing and hauling all generated refuse and waste to an off-site disposal area.
- Government Support: Government will provide utilities (water and electricity) and emergency services.
People
Points of Contact
Tristan TorresPRIMARY
Norena Marie PhillipsSECONDARY
Files
Versions
Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 11, 2026