FUSE & CONTROL PANE
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mech, has issued an amendment to reopen a competitive solicitation for the repair of FUSE & CONTROL PANE (CAGE 16331, Ref. No. 63E920630G1). This opportunity, issued under Emergency Acquisition Flexibilities (EAF), seeks to establish a bilateral award for repair services. Quotes are due by May 5, 2026.
Scope of Work
This solicitation is for the repair of FUSE & CONTROL PANE units. Key requirements include:
- Complete repair of material, including unwhole, missing hardware, damaged, or missing parts.
- Adherence to a Government-sought Repair Turnaround Time (RTAT) of 300 days. Contractors must state their RTAT, with price reductions for inexcusable delays.
- Performance of all inspection and testing per original manufacturer's specifications and drawings.
- Packaging in accordance with MIL-STD 2073.
- Government Source Inspection (GSI) is required.
Contract & Timeline
- Type: Solicitation (Competitive Requirement for Repair Services)
- Set-Aside: None specified (unrestricted competition)
- Response Due: May 5, 2026, 8:30 PM Z
- Published: May 5, 2026, 2:16 AM Z (Amendment date)
- Contract Award: Bilateral agreement
- Option: Government intends to exercise a 100% option quantity within 365 days of award.
Key Requirements & Submission
Offerors must provide:
- Firm pricing for repair, including costs for potentially unwhole or damaged material.
- Quote Amount, Unit Price, Total Price, and indicate if Firm-fixed-Price, Estimated, or Not-to-Exceed.
- Proposed Repair Turnaround Time (RTAT) and capacity constraints if not meeting the 300-day target.
- Price reduction amount per unit per month for late RTAT, up to a maximum.
- T&E fee/price if an asset is determined Beyond Repair (BR/BER).
- Awardee CAGE and performance location details.
- New unit price and delivery lead-time for comparison.
- Proof of authorized distributorship on company letterhead.
- Verify nomenclature, part number, and NSN prior to responding.
Additional Notes
This solicitation updates clauses to reflect competition and extends the quote period. Accelerated delivery is encouraged. Freight is FOB Origin and handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Contact Ashley H. Betlock at ASHLEY.H.BETLOCK.CIV@US.NAVY.MIL or 717-605-1028 for inquiries.