Galveston Harbor and Channel- San Jacinto PA 1 Improvements, Galveston County, Texas
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This document is an Abstract of Offers for Solicitation W912HY26BA020, concerning the FY26 Galveston Harbor and Channel - San Jacinto PA 1 Improvements in Galveston County, Texas. This procurement was a Total Small Business Set-Aside. Bids were opened on May 12, 2026, with Precision Construction, LLC identified as the apparent low bidder, 7.63% below the Government's Estimate.
Scope of Work
The project involves dike raising, outfall structure rehabilitation, replacement of existing outfall structures (Cell B), and new outfall structures at the San Jacinto Placement Area (PA). Key tasks include mobilization, demobilization, clearing, grubbing, stripping, final condition survey, turfing, onsite borrow soils geotechnical evaluation, as-built documentation, and various uncompacted/semi-compacted dike constructions. Option items cover similar work for Cell BC and additional demolition, new terminal drainage structure, and stone protection. The work is located along the Galveston seawall.
Contract Details
This was a Firm-Fixed Price contract with an estimated magnitude of $10,000,000.00 to $25,000,000.00. The estimated period of performance is 400 calendar days after Notice to Proceed. Performance and Payment Bonds were required within 5 calendar days after award.
Set-Aside & Eligibility
This opportunity was 100% Restricted for Small Business under NAICS Code 237990 (Dredging), with a size standard of $45,000,000.00. Subcontracting goals for the Galveston District included 76.0% Small Business, 1.0% Small Disadvantaged Business, 5.0% Woman-Owned Small Business, 3.0% HubZone Small Business, 17% Veteran-Owned Small Business, and 16.0% Service Disabled Veteran-Owned Small Business.
Key Dates & Status
- Solicitation Issued: April 3, 2026
- Bids Opened: May 12, 2026
- Abstract Published: May 13, 2026
- Apparent Low Bidder: Precision Construction, LLC
Contact Information
Danelle Tate (danelle.m.tate@usace.army.mil, 409-766-3116)