GAOA Gibb Wash Bridge Replacement, Coronado National Forest

SOL #: 127EAX26Q0022Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 7
Albuquerque, NM, 871023498, United States

Place of Performance

Tucson, AZ

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 17, 2026
2
Submission Deadline
May 15, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotes for the GAOA Gibb Wash Bridge Replacement project on the Coronado National Forest near Tucson, Arizona. This is a Total Small Business Set-Aside opportunity for commercial construction, involving the removal of an existing timber bridge and installation of a new steel structural plate arch bridge, along with significant associated road and stream work. Quotes are due by May 15, 2026, at 5:00 PM local time.

Scope of Work

This project entails the removal of a 24-foot single-lane timber bridge and the installation of a new 28'-1" span, 9'-6" rise, 28' long steel structural plate arch with welded wire headwalls. Key tasks include:

  • Embankment construction with a mechanically stabilized earth (MSE) wall.
  • Realignment of 550 feet of approach road.
  • Installation of a 24" diameter CMP culvert and guardrails.
  • Reconstruction of the stream channel and obliteration of the existing approach road.
  • Providing a bridge load rating signed by a Registered Professional Engineer.

Construction must adhere to FP-14 (2014 Edition), Forest Service Supplemental Specifications, AASHTO LRFD, ACI 318, ASTM, SSPC, ANSI, OSHA, and MUTCD standards. Extensive modifications to project specifications (Attachment 4) significantly alter technical requirements, procedures, and construction methods, requiring careful review by bidders.

Contract Details

  • Solicitation Type: Combined Synopsis/Solicitation (RFQ 127EAX26Q0022)
  • Contract Type: Firm-fixed price
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237310 (Highway, Street, and Bridge Construction) with a $45 Million size standard.
  • Place of Performance: Coronado National Forest, approximately 20 miles northeast of Tucson, Arizona.
  • Period of Performance: Work must commence within 10 calendar days of notice to proceed and be completed by June 14, 2027. In-stream work is restricted to October 1st – December 15th and March 1st – June 14th, with no work permitted from June 15th – September 30th due to wildlife breeding seasons.
  • Wage Rates: Prevailing wage rates for highway construction in Pima County, Arizona (AZ20260047, effective 01/02/2026) apply.

Submission & Evaluation

  • Quotes Due: May 15, 2026, at 5:00 PM local time.
  • Submission Method: Email to PPS.proposals@usda.gov.
  • Evaluation Factors: Best value determination based on a comparative evaluation of Technical Proposal (Technical Approach, Project Management & Oversight), Experience, Past Performance, and Price Quote.
  • Site Visit: An organized site visit is scheduled for April 29, 2026, at 10:00 AM MDT at the Gibb Wash Bridge.
  • Eligibility: Contractors must be registered in SAM.gov at the time of quote submission. A bid guarantee of 20% is required if the quote exceeds $150,000.

Key Attachments

Bidders must review all attachments, including the Statement of Work (Attachment 3), detailed engineering drawings (Attachment 5), Project Specifications (Attachment 4, which includes numerous amendments), Schedule of Items (Attachment 2), DBA Wage Determination (Attachment 7), and the Coronado Fire Plan (Attachment 6) outlining fire prevention and suppression requirements.

Contact Information

People

Points of Contact

Judith MartinPRIMARY
Troy McCulloughSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 17, 2026