GAOA SOUTH ZONE FENCE REPLACEMENT

SOL #: 1240LT26Q0016Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 8
Ogden, UT, 844012310, United States

Place of Performance

Moab, UT

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Fencing, Fences, Gates And Components (5660)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 20, 2026
2
Last Updated
Mar 24, 2026
3
Submission Deadline
Apr 3, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service, CSA INTERMOUNTAIN 8, under the Department of Agriculture, has issued a Combined Synopsis/Solicitation (RFQ) for the GAOA SOUTH ZONE FENCE REPLACEMENT project. This Total Small Business Set-Aside opportunity involves removing and replacing multiple barbed wire and wooden post and rail fences at campgrounds and lakes within the Manti La Sal National Forest. Quotes are due by April 3, 2026.

Scope of Work

This project requires the removal of existing fences and their replacement with new barbed wire and wooden post and rail fences across various sites in the Manti La Sal National Forest's Southern Portion (near Moab and Monticello, UT), with option items in the Northern Portion (near Price and Ephraim, UT). Specific locations include Warner, Mason, Oowah, Buckeye, Buckboard, Devils, Nizhoni, Porcupine Rim, and Monticello Lake. Option items cover additional rebuilds at Pack Creek, Gooseberry, Indian Creek, Orange Olsen, Potters Pond, and Mammoth.

Key requirements include:

  • Materials: Treated Lodgepole Pine posts, steel T-posts, specific barbed and smooth wire types, and metal H-braces (preferred).
  • Installation: Adherence to detailed specifications for post setting, bracing, and wire fastening. Clarifications from Amendment 0003 specify 3/8" bolts (SOW Section 3.3 supersedes Attachment 8) and that existing gates found in place of rebuilt sections should be reused as incidental to line items. The "Stuart" site mentioned in the KMZ file is not included.
  • Site Conditions: No water or utilities are available at sites; contractors must provide temporary facilities. All equipment must be pressure washed before entering National Forest System lands. Construction sites will remain open to the public, requiring contractor management. All demolition debris must be removed.

Contract & Timeline

  • Solicitation Number: 1240LT26Q0016
  • Contract Type: Request for Quotation (RFQ), anticipated Firm Fixed Price.
  • Set-Aside: Total Small Business Set-Aside.
  • NAICS: 238990 (Fencing, Fences, Gates And Components).
  • Small Business Size Standard: 5660.
  • Period of Performance: May 1, 2026, to April 26, 2027.
  • Response Due: April 3, 2026, 12:00 PM MT.
  • Published Date: March 23, 2026.

Evaluation Factors

Award will be made to the quoter with the Lowest Price Technically Acceptable offer. Technical acceptability will be assessed based on past experience (within the last three years) in demolition and installation of barbed wire, wooden rail, pole, and lay down fencing. Bidders must complete the Experience Questionnaire (Attachment 4) to demonstrate capability. Offers must hold prices firm for 60 calendar days.

Additional Notes

A quote checklist has been provided. The full text of provisions and clauses is accessible at www.acquisition.gov. A site visit is not feasible; bidders should review Attachment 14 (Site Pictures) and request the KMZ file for project coordinates from tony.taylor@usda.gov. Davis-Bacon Act Wage Determinations (UT20260017, UT20260022, UT20260027, CO20260003) are applicable for labor cost estimation. Amendment 0002 updated the Schedule of Items (Attachment 3.1), adding a Mobilization line item (including bond premiums) and splitting line items for sites with mixed fencing.

People

Points of Contact

Tony Taylor Contract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Mar 23, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Mar 19, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 17, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 20, 2026
View
GAOA SOUTH ZONE FENCE REPLACEMENT | GovScope