GAOA Star meadow Barn Foundation Flathead National Forest

SOL #: 1240LU26Q0021Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
Flathead National Forest
HUNGRY HORSE, MT, 59919, United States

Place of Performance

Whitefish, MT

NAICS

Other Foundation (238190)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 2, 2026
2
Last Updated
Mar 23, 2026
3
Submission Deadline
Mar 31, 2026, 10:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Forest Service, Flathead National Forest, is soliciting proposals for the replacement of the historic Star Meadow Barn Foundation in Whitefish, MT. This is a Total Small Business Set-Aside opportunity for commercial construction services. Proposals are due March 31, 2026, at 4:30 p.m. MST.

Project Overview

This combined synopsis/solicitation seeks a contractor to demolish the existing concrete barn foundation, excavate, and install a new foundation with a crawlspace. The project also includes landscaping, installation of gravel base material and concrete footings, and removal/replacement of septic drain field tiles. The contractor is responsible for supplying all labor, tools, equipment, materials, and services, and for field verifying existing building dimensions.

Scope of Work

Key tasks include:

  • Demolition: Removal of existing concrete foundation and septic tiles.
  • Excavation & Backfill: Preparation for new foundation, including material specifications and compaction.
  • Foundation Installation: Construction of a new foundation with a crawlspace, including concrete footings, wall sections, beam support, and chimney foundation.
  • Septic System: Removal and replacement of septic drain field tiles, and landscaping to cover the drain field with 18 inches of backfill. Septic field maintenance to repair three infiltration tiles and complete original design backfill.
  • Site Work: Pollution and erosion control, worksite cleanliness, legal disposal of refuse, and reinstallation of split rail wooden fences.
  • Coordination: Regular contact with the Contracting Officer/COR, with two weeks' prior notification required before entering the work site.
  • Submittals: Plans for excavation/foundation, Safety Plan, Concrete Mix Design, and Work Schedule.

Contract Details

  • Type: Firm-Fixed Price Commercial Construction
  • Estimated Value: $25,000 - $100,000
  • Set-Aside: Total Small Business (NAICS 238190, Size Standard $19 Million)
  • Period of Performance: May 25, 2026, to August 30, 2026.
  • Bonds: Bid Bond (20% if >$150,000), Performance & Payment Bonds (100% if >$150,000, due 10 days after award). For contracts between $35,000 and $150,000, an irrevocable letter of credit or payment bond is allowed, due within 10 days of award.
  • Wage Rates: Subject to prevailing wage rates and fringe benefits for Flathead County, Montana (General Decision Number MT20260032).

Submission & Evaluation

  • Submission Deadline: March 31, 2026, at 04:30 p.m. MST.
  • Submission Method: Email proposals to PPS.proposals@usda.gov in Microsoft Word, Excel, or Adobe PDF format. The subject line must include the solicitation name and number.
  • Evaluation: Quotes will be evaluated using a comparative evaluation methodology, with award made to the contractor representing the best value to the Government. Factors include Technical Approach, Experience, Past Performance, and Price Quote (evaluated for reasonableness and consistency).
  • Quote Acceptance: Prices must be held firm for 60 calendar days from the quote receipt date.

Key Attachments & Site Visit

  • Required Submissions: Completed Schedule of Items (Attachment 2) and Experience Questionnaire (Attachment 7).
  • Technical Documents: Detailed Statement of Work (Attachment 3), Specifications (Attachment 4), and Construction Plans and Drawings (Attachment 5) are provided.
  • Site Visit: A site visit was conducted on March 17, 2026, at 11:00 a.m. at the Star Meadows Barn, 5250 Star Meadows Road, Whitefish MT. Contractors were urged to inspect the site.

Amendments

  • Amendment 0001: Provided site visit information and answered questions regarding barn cleaning, fence replacement, and aggregate details. Confirmed the period of performance.
  • Amendment 0002: Provided answers to questions, confirming a septic permit has been obtained and the project includes septic field maintenance. Reconfirmed the period of performance.

People

Points of Contact

Jeffrey BlackSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Mar 23, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 18, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 2, 2026
View
GAOA Star meadow Barn Foundation Flathead National Forest | GovScope