Geiger Quad G530 & G550 DOAS Replacement

SOL #: N4008526R9031Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 29, 2026
2
Last Updated
Jun 2, 2026
3
Submission Deadline
May 29, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for the Geiger Quad G530 & G550 DOAS Replacement project at Camp Lejeune, NC. This is a Combined Synopsis/Solicitation under a Total Small Business Set-Aside (FAR 19.5). Proposals are due May 29, 2026, at 1:00 PM EST.

Scope of Work

This project involves the replacement of Direct Outside Air System (DOAS) Units across multiple buildings within Geiger Quad G530 and G550 at Camp Geiger, Marine Corps Base Camp Lejeune. Specifically, units at G530, G531, G531A, G531B, G531C, G550, G551, G551A, G551B, and G551C will be replaced. The scope includes all incidental related work, demolition of existing equipment, and integration of new HVAC equipment controls with the Johnson Controls, Inc. (JCI) Metasys system. The work is classified as Building Construction.

Contract Details

  • Type: Implied Fixed-Price contract, with award based on Lowest Price.
  • Estimated Value: Between $1,000,000 and $5,000,000.
  • Completion: 720 calendar days after award.
  • Liquidated Damages: $880 per calendar day for delays.
  • Bonds: Bid bonds are required based on dollar values: 20% for proposals over $150K (which also require payment and performance bonds). Payment bond only for proposals between $35K and $150K.
  • Wage Requirements: Subject to Wage Determination NC20260010, Executive Order 13706 (Paid Sick Leave), and Executive Order 13658 (Minimum Wage).

Key Requirements

  • Eligibility: Only specific Mechanical MACC Contractors are eligible to submit proposals: Mechworks Mechanical Contractors, Inc.; North State Mechanical, Inc.; and R&W Construction Company, Inc.
  • Special Scheduling: Construction may not commence until new equipment is onsite, and only one DOAS unit may be offline at any given time.
  • Compliance: Adherence to Buy American Requirement-Construction Materials, detailed specifications for HVAC, electrical, instrumentation and control (DDC, BACnet, cybersecurity), and environmental protection.
  • Quality Control & Safety: A robust Quality Control (QC) program, including a QC Manager, and strict adherence to safety requirements are mandatory. One individual may fulfill Superintendent, QC Manager, and Safety & Health Officer roles if qualified.

Submission & Evaluation

  • Proposal Due: May 29, 2026, 1:00 PM EST.
  • Submission Method: Via email to jessica.r.huebner.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil. Offers must be submitted on all line items.
  • Evaluation Basis: Lowest Price.
  • Proposal Acceptance Period: 60 days from receipt of offers.
  • Mandatory Site Visit: Scheduled for Tuesday, May 12th at 1300 at Building G530 (as per Amendment 0001).
  • Requests for Information (RFIs): Must be submitted by the prime contractor to jessica.r.huebner.civ@us.navy.mil by May 14, 2026, 2:00 PM EST.
  • Amendments: Offerors must acknowledge all amendments (including Amendment 0001 and 0002) with their proposal. Amendment 0002 clarifies that DD Form 1354 is NOT required.

Important Notes

Funding may not become available, and no award will be made if funds are not secured. Offerors will not be reimbursed for any proposal costs.

People

Points of Contact

Lauren LocontoSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Jun 2, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 26, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 13, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: May 12, 2026
Version 2
Combined Synopsis/Solicitation
Posted: May 5, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View