Greenhouse Controls Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA, Agricultural Research Service (ARS) is seeking proposals for the replacement of greenhouse control systems at the Plant Genetic Resources Conservation Unit located on the University of Georgia (UGA) Griffin Campus, Griffin, GA. This is a Total Small Business Set-Aside under NAICS 238210. The project involves a turn-key replacement of existing Wadsworth control systems with new Bartlett Climate Boss Controllers and associated components for five greenhouses. Proposals are due June 11, 2026, at 7:30 AM ET.
Scope of Work
The contractor will provide all personnel, equipment, materials, and supervision for a turn-key project to replace greenhouse control systems. Key tasks include:
- System Replacement: Removal and disposal of existing Wadsworth control panels and installation of new Bartlett Climate Boss Controllers for Greenhouses #2, #3, #108, #110, and #4442.
- Ventilation Controls: Removal and installation of new ridge vent controls, motors, sensors, and wiring for all five greenhouses, and side vent controls for Greenhouses #108, #110, and #4442.
- Weather Systems: Installation of new weather boss systems and establishment of new electrical and control circuits for weather controls.
- Ancillary Services: Installation of mounting hardware, programming of new equipment, verification of greenhouse operation, provision of training to site personnel, and supply of installation/programming manuals.
- Warranty: A one-year warranty on all parts and labor is required.
- Optional Work: The solicitation includes options for replacing controls for Greenhouses #5 and #6, and replacing roof/ridge vent coverings with polycarbonate for Greenhouses #110 and #4442.
Contract Details
- Contract Type: Firm Fixed-Price.
- Set-Aside: Total Small Business.
- NAICS Code: 238210 Electrical Contractors and Other Wiring Installation Contractors (Size Standard: $19.0M).
- Period of Performance: Estimated from June 15, 2026, to September 30, 2026. Work must commence within 10 calendar days of Notice to Proceed and be completed within 90 calendar days.
- Place of Performance: 1109 Experiment Street, Griffin, GA 30223.
Submission & Evaluation
- Proposals Due: June 11, 2026, at 7:30 AM ET.
- Requests for Information (RFIs) Due: June 2, 2026, at 7:30 AM ET.
- Evaluation Basis: Lowest Priced Technically Acceptable (LPTA). Technical acceptability requires meeting all solicitation requirements, providing documented recent and relevant experience, and an acceptable past performance rating.
- Award Basis: "All or none."
- Eligibility: Offerors must have an active registration in SAM.gov at the time of solicitation closing.
Important Notes
- Mandatory Site Visit: A mandatory site visit is scheduled for May 27, 2026, at 9:30 AM EST. Registration is required by May 26, 2026, at 12:00 PM EST. Attendance by the Prime Contractor is mandatory.
- Wage Determination: Bidders must adhere to the prevailing wage rates and fringe benefits outlined in the Georgia Building Construction Projects Wage Determination (GA20260313).
- Contact: David Reynolds, david.reynolds2@usda.gov.