Ground Vehicle System Center (GVSC) Commercial Solutions Opening (CSO)

SOL #: W912CH-24-S-0002Special Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W4GG HQ US ARMY TACOM
DETROIT ARSENAL, MI, 48397-5000, United States

Place of Performance

Warren, MI

NAICS

No NAICS code specified

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Jun 5, 2024
2
Last Updated
Apr 2, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Combat Capabilities Development Command (DEVCOM) Ground Vehicle Systems Center (GVSC) has issued a Commercial Solutions Opening (CSO) to accelerate the delivery and sustainment of ground system capabilities. This CSO seeks innovative commercial technologies to develop systems resistant to obsolescence and achieve future dominance in the ground domain. It may result in various award types, including FAR contracts and non-FAR agreements, through multi-phased competitive processes throughout 2029. Key Areas of Interest (AoIs) are continuously updated, with specific deadlines for some, such as the "Durable Replacement Track System for M88A2 Vehicle" (due April 6, 2026) and "Next-Generation Vehicle Protection Systems Base Kit" (due January 30, 2026).

Purpose & Scope

GVSC, located in Warren, MI, is the U.S. Armed Forces’ research and development facility for advanced ground systems technology. This CSO aims to identify and invest in technologies, competencies, and infrastructure that enhance the effectiveness of development, integration, demonstration, and sustainment of ground vehicle systems capabilities, supporting Army modernization priorities and improving readiness.

Key Technology Focus Areas

GVSC's current technology focus areas include:

  • Power and Mobility (e.g., Vehicle Power Generation and Distribution, Propulsion Systems)
  • Autonomous Systems
  • Force Projection (e.g., Bridging and Gap Defeat)
  • Survivability & Protection (e.g., Soft Kill System Development, Signature Management Technologies, Next-Generation Vehicle Protection Systems Kit)
  • Electronics and Architecture
  • Cyber Engineering and Software Integration (e.g., Software Engineering Center AoI)
  • Human Machine Integration
  • Advance Manufacturing and Modeling
  • Simulation and Prototyping (e.g., Innovative Training Aids and Simulators)
  • Ground Vehicle Robotics (e.g., Autonomous Minefield Clearance Robot, Textile Based Camouflage System, Thermal and HD Pan Tilt Zoom (PTZ) Camera)

Contract & Timeline

  • Type: Commercial Solutions Opening (CSO) under 10 U.S.C 4022, 31 U.S.C. 6305, or FAR Part 12 contracts.
  • Duration: Multi-phased, competitive processes throughout 2029.
  • Set-Aside: None specified.
  • Proposal Validity: 180 days.
  • Key Deadlines:
    • "Durable Replacement Track System for M88A2 Vehicle": April 6, 2026
    • "Next-Generation Vehicle Protection Systems Base Kit": January 30, 2026
    • "Textile Based Camouflage System" and "Thermal and HD Pan Tilt Zoom (PTZ) Camera": Continuous Submission
  • Published: March 19, 2026 (latest amendment date).

Recent Amendments & Areas of Interest

Recent amendments have significantly updated the scope of this CSO:

  • Amendment 16 (March 19, 2026): Added "Vehicle Power Generation and Distribution," "Components Required to Enable Vehicle Power Generation and Power Distribution," and "Propulsion Systems" AoIs. Extended the "Durable Replacement Track System for M88A2 Vehicle" deadline to April 6, 2026, and made "Textile Based Camouflage System" and "Thermal and HD Pan Tilt Zoom (PTZ) Camera" open for continuous submission.
  • Amendment 14 (February 24, 2026): Removed "Strategic Investment and Capabilities" and "Supply Chain Visibility" AoIs, updated "Castings" to "Castings and Forging," and added a new "Software Engineering Center (SEC)" AoI.
  • Amendment 13 (February 6, 2026): Updated the general inquiries Technical Point of Contact to Derek Dycio and added "Soft Kill System Development, Integration and Demonstration" and "Bridging and Gap Defeat" AoIs.
  • Amendment 12 (January 30, 2026): Introduced "Multi-Payload Launcher," "Autonomous Commercial Vehicle (ACV)," "Aided Detection Target Recognition (AiDTR) System," and "Modular Obscuration System" AoIs.
  • Amendment 11 (December 29, 2025): Extended the "Next-Generation Vehicle Protection Systems Base Kit" deadline to January 30, 2026.

Submission & Contact Information

Interested parties should monitor SAM.gov for new AoI postings and specific submission requirements. Proposals will follow a multi-phased process (Solution Brief, Presentation, Commercial Solution Proposal).

People

Points of Contact

Derek DycioPRIMARY
RYAN STACEYSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 21
Special Notice
Posted: Apr 2, 2026
View
Version 20Viewing
Special Notice
Posted: Mar 19, 2026
Version 19
Special Notice
Posted: Mar 3, 2026
View
Version 18
Special Notice
Posted: Feb 24, 2026
View
Version 17
Special Notice
Posted: Feb 3, 2026
View
Version 16
Special Notice
Posted: Jan 20, 2026
View
Version 15
Special Notice
Posted: Dec 29, 2025
View
Version 14
Special Notice
Posted: Dec 12, 2025
View
Version 13
Special Notice
Posted: Nov 19, 2025
View
Version 12
Special Notice
Posted: Sep 17, 2025
View
Version 11
Special Notice
Posted: Sep 16, 2025
View
Version 10
Special Notice
Posted: Aug 5, 2025
View
Version 9
Special Notice
Posted: Jul 22, 2025
View
Version 8
Special Notice
Posted: Jul 18, 2025
View
Version 7
Special Notice
Posted: Jul 16, 2025
View
Version 6
Special Notice
Posted: Jul 10, 2025
View
Version 5
Special Notice
Posted: May 12, 2025
View
Version 4
Special Notice
Posted: Apr 30, 2025
View
Version 3
Special Notice
Posted: Feb 28, 2025
View
Version 2
Special Notice
Posted: Feb 28, 2025
View
Version 1
Special Notice
Posted: Jun 5, 2024
View