GROUNDS MAINTENANCE FORT STEWART/HAAF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, MICC-FT STEWART, is soliciting proposals for Grounds Maintenance Services at Fort Stewart and Hunter Army Airfield, Georgia. This is a Firm Fixed-Price (FFP) contract, set aside for 100% Total Small Business concerns. The acquisition covers comprehensive grounds maintenance, including specialized care for areas like Warriors Walk. Proposals are due June 12, 2026, at 2:00 PM EST.
Scope of Work
This non-personal services contract requires the contractor to provide all personnel, equipment, supplies, and supervision for grounds maintenance. Services include:
- Mowing, edging, trimming, and leaf/debris removal across Improved, Semi-Improved, and Unimproved Areas.
- Specialized maintenance for Warriors Walk, including Crape Myrtle tree care (pruning twice annually) and replacement.
- Maintenance of Airfields (Wright Army Airfield: 374 acres, Hunter Army Airfield: 506 acres, estimated 7 cuts/year) and Cemeteries (approx. 22 acres at FS, 2 acres at HAAF, 3 cuts/year with headstone trimming).
- Weed control, irrigation system operation, and special event services.
- Coordination with Range Control is required before entering range areas.
Contract & Timeline
- Contract Type: Firm Fixed Price (FFP)
- Set-Aside: 100% Total Small Business
- NAICS Code: 561730 (Landscaping, Lawn Maintenance), $9.5M size standard
- Period of Performance:
- 2-month phase-in: September 1, 2026 – October 31, 2026
- Base Period: November 1, 2026 – August 31, 2027 (10 months)
- Four (4) 12-month option periods: September 1, 2027 – August 31, 2031
- Potential 6-month extension.
- Place of Performance: Fort Stewart and Hunter Army Airfield, Georgia.
- Proposal Due Date: June 12, 2026, at 2:00 PM EST.
- Published Date: June 2, 2026 (latest amendment).
Submission & Evaluation
- Submission: Proposals must be submitted electronically via email to both the Contracting Officer, Lacey Turner (lacey.m.turner2.civ@army.mil), and Contract Specialist, Cosmin Popa (cosmin.popa.civ@army.mil). Disregard PIEE submission guidance.
- Evaluation: Award will be made to the Lowest-Priced Technically Acceptable (LPTA) offeror. Evaluation factors include:
- Technical Capability: Clear, feasible approach, staffing, management, phase-in plan, Georgia herbicide certification, landscape experience, and memorial/cemetery maintenance experience. State licenses/certifications and 3-year corporate/personnel experience are excluded from the 10-page limit for Volume II.
- Past Performance: Recency and relevancy, requiring at least 3,000 acres of grounds maintenance experience.
- Price: Reasonableness.
- Eligibility: Offerors must be registered in SAM.gov. Multiple Service Contract Act Wage Determinations apply.
Additional Notes
Bidders must acknowledge all solicitation amendments. Required deliverables include a phase-in plan, Safety Plan, Spill Plan, Key Personnel Roster, and proof of required insurance. Contractor storage site policies and access control card requests are detailed in attachments.