GRSM, Roof Replacements on 5 Bldgs, NC

SOL #: 140P5126Q0031Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
SER NORTH MABO (53000)
GATLINBURG, TN, 37738, United States

Place of Performance

Place of performance not available

NAICS

Roofing Contractors (238160)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 18, 2026
2
Submission Deadline
Jun 17, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), Great Smoky Mountains National Park, is seeking proposals for Firm Fixed-Price contracts for Roof Replacements on five buildings across the Collins Creek and Deep Creek picnic areas in Swain County, North Carolina. This is a 100% Total Small Business Set-Aside. The project involves replacing approximately 7,700 square feet of roofing. Proposals are due June 17, 2026, at 5 PM EDT.

Opportunity Overview

This combined synopsis/solicitation covers roof replacements for three buildings at the Collins Creek Picnic Area (Pavilion, Comfort Stations 414 & 416) and two buildings at the Deep Creek Picnic Area (Pavilion, Comfort Station 462). The work is located within the Great Smoky Mountains National Park, North Carolina side.

Scope of Work

The contractor will be responsible for removing existing asphalt shingles and components, protecting the surrounding environment, and installing new CertainTeed Presidential Shake asphalt shingles (Weathered Wood color) or an approved equivalent. Key tasks include addressing up to 25% rotten decking per structure, installing ice and water shields, underlayment, aluminum drip edge, new flashing, vent boots, and permanent fall protection roof anchors designed to withstand 1,800 lbs of force. All work must adhere to manufacturer's installation standards and NPS regulations.

Contract Details

  • Contract Type: Firm Fixed Price Construction
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 238260 (Roofing Contractors, $19M size standard)
  • Period of Performance: 150 calendar days from Notice to Proceed. Work hours are generally 7:00 am to 3:30 pm, Monday through Friday.
  • Wage Determination: General Decision Number NC20260061 applies, outlining prevailing wage rates and fringe benefits for construction trades in North Carolina, including Swain County.

Key Dates & Site Visit

  • Site Visit: Scheduled for June 4, 2026. Meet at Deep Creek structures at 10:00 AM EDT, then Collins Creek structures at 12:00 PM EDT.
  • Questions Cut-off: June 5, 2026, at 1:00 PM EDT. Submit questions via email to Ashley Warcewicz.
  • Proposals Due: June 17, 2026, at 5:00 PM EDT. Submit electronically via email to Ashley Warcewicz.

Evaluation & Submission Requirements

Award will be made to the responsible Offeror with the Lowest Price Technically Acceptable (LPTA) proposal. Technical acceptability is a Pass/Fail evaluation based on submission of a completed Attachment 9. This attachment requires details on:

  • Company information (UEI, CAGE, POC).
  • Two relevant projects within the last five years demonstrating experience with similar roofing systems.
  • Identification of key subcontractors and their qualifications.
  • Acknowledgment of the 150-day Period of Performance.
  • A technical/management approach, including proposed roof material.
  • A summary of the site-specific safety and security plan.
  • Past performance documentation. Offerors must be registered in SAM.gov prior to award.

Special Requirements

Contractors must maintain State of North Carolina insurance regulations (Workers Compensation and Liability), comply with OSHA, EPA, and state/local safety laws, and develop a Quality Control Plan (QCP).

People

Points of Contact

Warcewicz, AshleyPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 18, 2026
GRSM, Roof Replacements on 5 Bldgs, NC | GovScope