Guardrail Replacement, Hodges Village Dam, Oxford, MA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers - New England District has issued a Presolicitation Notice for Guardrail Replacement at Hodges Village Dam in Oxford, MA. This opportunity is a Total Small Business Set-Aside with an estimated magnitude between $25,000 and $100,000. The solicitation is anticipated to be released on or about June 16, 2026.
Scope of Work
The work involves providing all labor, materials, equipment, and transportation necessary to replace existing metal guardrails. This replacement will occur around the perimeter of Augutleback Pond and along the main access road at Hodges Village Dam.
Contract & Timeline
- Type: Presolicitation (leading to a construction contract)
- Magnitude: Between $25,000 and $100,000
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS: 237310 (Construction Of Highways, Roads, Streets, Bridges, And Railways)
- Solicitation Release: On or about June 16, 2026
- Published: June 1, 2026
Additional Notes
This is not a request for quotes at this time. The solicitation and associated documents, including submission instructions and the response date, will be available exclusively online via www.SAM.gov. Telephonic, mailed, or faxed requests for hard copies will not be accepted. All vendors must have an active registration in SAM.gov at the time of submission to be considered; non-registered vendors will be rejected. Questions regarding the procurement will not be answered during this presolicitation phase; they should be submitted to the Contract Specialist after the solicitation is posted.