Harris Road Fence and Double Gate Installation

SOL #: FA446026Q0366Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4460 19 CONS PKA
LITTLE ROCK AFB, AR, 72099-4971, United States

Place of Performance

Little Rock Air Force Base, AR

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Fencing, Fences, Gates And Components (5660)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 4, 2026
2
Last Updated
Mar 20, 2026
3
Submission Deadline
Mar 25, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for Harris Road Fence and Double Gate Installation at Little Rock Air Force Base, AR 72099. This project involves removing existing fencing and installing approximately 1,400 linear feet of new chain link fence and a new 24-foot double gate to re-establish the base perimeter. This opportunity is a Total Small Business Set-Aside. Responses are due by March 25, 2026.

Scope of Work

The contractor shall provide all personnel, transportation, tools, equipment, materials, and services. Key tasks include:

  • Removal of minimal existing perimeter barbed wire fence and posts (primarily lying on the ground).
  • Installation of approximately 1,400 linear feet of new chain link fence and a new 24-foot double gate.
  • Materials must match existing fence in gauge, equipment, tools, hardware, height, rails, posts, and guide wire. Fence height minimum 8 feet (including outriggers).
  • Specific concrete footings for corner, end, pull, and line posts.
  • Three-strand climb-resistant top to match existing fence.
  • Double gate to be 24' wide with 1 7/8" framed pipe and 6 5/8" gate posts, galvanized steel, meeting UL 325 and ASTM F2200 standards.
  • Installation over small creeks or marshy areas must allow water and debris flow, with the fence bottom just above normal water level (no culverts or gravel berms included).
  • No grounding is required for the fence; the gate is manual.
  • The Government's in-house shop will clear a 15-20 foot path; no stump grinding or site grading will occur.

Contract & Timeline

  • Type: Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Place of Performance: Harris Road, Little Rock AFB, AR 72099
  • Period of Performance: Work to be completed within 60 calendar days of material arrival.
  • Response Due: March 25, 2026, 7:00 PM UTC
  • Published Date: March 20, 2026

Evaluation Criteria

Award will be made to the responsible offeror whose offer is most advantageous to the Government, considering price and technical acceptability. Offers will be ranked by price, and technical evaluations will begin with the lowest-priced offer until at least three "Acceptable" offers are identified. If fewer than three offers are received, all will undergo technical evaluation. The Government reserves the right to communicate with offerors and award based on best value.

Submission Requirements & Special Notes

  • Offers must utilize the CLIN structure specified in "FA4460-26-Q-0366 COMBO" and include detailed technical descriptions, price breakdown, SAM.gov registration, and acknowledgment of amendments.
  • Offerors agree to hold prices firm for 30 calendar days.
  • No bid guarantee, payment, or performance bonds are required as this is for commercial items.
  • REAL ID is required for base access. Subcontracting is allowed.
  • Contractor must provide a contract manager and a Project Manager with a minimum of 5 years of experience.
  • All work must comply with UFGS 32-31-13, UFC 4-022-03, and ASTM Standards.
  • Contractor is responsible for waste disposal (except hazardous material) and subject to all installation regulations.
  • Site visit was not mandatory. Weekend work is allowed with prior coordination.

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Mar 20, 2026
Version 1
Solicitation
Posted: Mar 4, 2026
View
Harris Road Fence and Double Gate Installation | GovScope