Harry S. Truman Lake Project Powerplant Elevator Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The US Army Corps of Engineers, Kansas City District, intends to issue a Request for Proposal (RFP) for the Harry S. Truman Lake Project Powerplant Elevator Replacement in Warsaw, Missouri. This will be a Firm-Fixed-Price, Two-Phase Design-Build contract, designated as a 100% Total Small Business Set-Aside. The estimated project magnitude is between $1,000,000 and $5,000,000.
Scope of Work
The project involves the complete replacement of the service elevator at the Harry S. Truman Power Plant. This includes all tasks for construction, commissioning, and project closeout. The new elevator will have a 4500 lb. weight rating, be an industrial/service-only cab (not required to meet ADA), and prioritize hoist power over speed.
Contract & Timeline
- Contract Type: Firm-Fixed-Price, Two-Phase Design-Build
- Period of Performance: 540 calendar days from Notice to Proceed (NTP)
- Estimated Magnitude: Between $1,000,000 and $5,000,000
- Set-Aside: 100% Total Small Business
- NAICS Code: 238290 (Other Building Equipment Contractors)
- PSC: Y1QA (Construction of / Restoration of Real Property)
- Solicitation Release: Expected within the next 15 days (not less than 15 days from 2026-05-19)
- Offers Due: Expected within 30 days after solicitation release (specific date in RFP)
Evaluation
This procurement will be solicited and evaluated in accordance with RFO Part 15, utilizing a two-phase design-build process.
Additional Notes
- Pre-Solicitation Conference: None planned at this time.
- Site Visit: A site visit is planned; details will be included in the solicitation.
- Plans & Drawings: Will be provided via SAM.gov once the solicitation is posted.
- Bonds: Bid Bonds are required for 20% of the bid price or $3,000,000 (whichever is less) for offers $150,000 or more. Payment and Performance Bonds for 100% of the awarded contract value are required before NTP.
- SAM.gov Registration: Active registration in SAM.gov is mandatory for all interested contractors and Joint Ventures prior to submitting an offer and to access solicitation documents. Updates and amendments will be distributed via SAM.gov/PIEE.
- Contact: For inquiries, contact Angella Curran at angella.curran@usace.army.mil or 816-389-3816.