S--HAVO Eruption Debris Clean Up
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Interior, National Park Service is soliciting quotes for HAVO Eruption Debris Clean Up at Hawaiʻi Volcanoes National Park, HI. This Total Small Business Set-Aside opportunity requires contractors to remove volcanic debris and pressure wash roofs and gutters from designated buildings and developed areas. Quotes are due Thursday, April 6, 2026, at noon HT.
Scope of Work
The objective is to restore affected areas to safe and serviceable conditions by removing volcanic debris (tephra, ash, rocks, Pele's hair) from designated roofs and developed areas. Key tasks include:
- Removing volcanic debris and pressure washing roofs and gutters of specific buildings (e.g., Kilauea Visitor Center, Entrance Station, VEOC, Trades Building, Fire House, Education Center, Ohia Wing, USGS PIERC, Magma House, Art Gallery, Auto Shop, Tire Shop, B216, B350).
- Minimizing airborne dispersion and secondary contamination.
- Employing industry-standard methods to prevent damage to structures.
- Providing all necessary management, tools, equipment, materials, and labor.
- Spreading debris evenly in designated grassy areas behind each unit.
Contract & Timeline
- Opportunity Type: Combined Synopsis/Solicitation (RFQ)
- Contract Type: Firm Fixed Price
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 562112 (Remediation Services)
- Period of Performance: April 23, 2026, to June 22, 2026
- Quote Submission Deadline: Thursday, April 6, 2026, at noon HT
- Published Date: March 31, 2026 (latest amendment)
Key Requirements & Special Conditions
- A mandatory site visit is required prior to proposal submission to verify existing conditions.
- Contractor must develop and maintain a Quality Control Plan (QCP) and a Site-Specific Safety Plan prior to mobilization, adhering to OSHA standards (e.g., 29 CFR 1926 Subpart M for fall protection, using non-penetrating anchor systems).
- Personnel must be trained and equipped for handling volcanic materials and present a neat, recognizable appearance.
- Strict adherence to park grounds requirements, including invasive species prevention protocols.
- Coordination with park operations to minimize disruption to visitors and staff.
- A mandatory pre-performance meeting and submission of a work schedule 7 days prior to start.
- Solar panel cleaning is included as part of overall roof cleaning.
- Bidders must use the revised Price Schedule for cost proposals.
Evaluation Factors
Proposals will be evaluated based on Price, Technical capability, and Past Performance. Offerors must confirm active SAM.gov registration.
Contact Information
Primary Point of Contact: Christine Tapp, christine_tapp@nps.gov, 360-869-3670.