Heaters for Active Cooled Beam Screen Cryo Interface

SOL #: MB474724Combined Synopsis/Solicitation

Overview

Buyer

Energy
Energy, Department Of
BROOKHAVEN NATL LAB -DOE CONTRACTOR
Upton, NY, 11973, United States

Place of Performance

Upton, NY

NAICS

Heating Equipment (except Warm Air Furnaces) Manufacturing (333414)

PSC

Heat Exchangers And Steam Condensers (4420)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 9, 2026
2
Last Updated
Mar 30, 2026
3
Submission Deadline
Apr 17, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Energy (DOE), through Brookhaven National Laboratory (BNL), is soliciting quotes for the fabrication of forty (40) heaters and forty (40) heater housings for an Active Cooled Beam Screen Cryo Interface. This is a Total Small Business Set-Aside opportunity. Quotes are due by April 17, 2026.

Scope of Work

This solicitation requires the fabrication of 40 heaters and 40 heater housings designed to operate in a liquid helium environment (2.5 g/s mass flow, 4.7K inlet temperature, 3.5 Bar pressure). Heaters must adhere to ASME B31.3 process piping standards with specific pressure and temperature ratings.

  • Heater Specifications: 260mm length, 57mm cold length, 8mm outer diameter, 500-Watt at 208 Volts, and include a Thermocouple Type J temperature sensor.
  • Housing Specifications: 258mm length, 12.7mm outer diameter, 8mm inner diameter, with an 18mm section on the open end. The design must maximize surface area for heat transfer and ensure uniform helium heating.

Technical Requirements & Performance Standards

  • Maximum Allowable Pressure Drop: 1.15 mbar across the heater.
  • Drawings: Vendor must supply approval drawings in ASME formatting before fabrication.
  • Testing: Standard ASME Pressure Test Code pressure testing and functional performance tests are required prior to delivery, with relevant reports and temperature rise signals. No source, in-process, or on-site inspection at the manufacturer's facility is anticipated.
  • Certifications: Required certificates include Finishing, Conformance, Material, Calibration, and ISO 9001 for all assemblies. All parts provided must be new.
  • Delivery: Lead time must be included in the quote; partial and early deliveries are acceptable. The vendor will ship the heaters and housings as an assembly.

Contract Details

  • Type: Combined Synopsis/Solicitation, Firm-Fixed Price.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Product Service Code: 4420 (Heat Exchangers And Steam Condensers).
  • NAICS Code: 333414 (500 employees size standard).
  • Place of Performance: Upton, NY, United States.
  • Terms: FOB Destination, Freight Prepaid, Net 30 payment terms. The Buy American Act applies.

Submission & Evaluation

  • Quotes Due: April 17, 2026, by 5:00 PM EST.
  • Submission: Email submissions are required and must include a signed Quotation Pricing Sheet (Enclosure C) and all descriptive material to confirm product compliance.
  • Evaluation: Award will be made to the responsive and responsible Offeror submitting the lowest total price that meets all technical requirements. Quote validity period is 45 days.

Key Dates & Contact

  • Published Date: March 30, 2026.
  • Primary Contact: MARK BRYAN (MBRYAN@BNL.GOV).

People

Points of Contact

MARK BRYANPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Mar 27, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 23, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 9, 2026
View
Heaters for Active Cooled Beam Screen Cryo Interface | GovScope