Ice Machine Install

SOL #: W9124926RA013Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT GORDON
FORT GORDON, GA, 30905, United States

Place of Performance

Fort Gordon, GA

NAICS

Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing (333415)

PSC

Installation Of Equipment: Miscellaneous (N099)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 16, 2026
2
Last Updated
Mar 28, 2026
3
Submission Deadline
Mar 30, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, MICC-FT Gordon, is soliciting proposals for a non-personal services contract to install an existing outdoor commercial ice machine to the adjacent barracks, Building 33805, at Fort Gordon, GA. This is a Total Small Business Set-Aside. A mandatory site visit was held on March 23, 2026. Proposals are due Monday, March 30, 2026, at 4:00 PM.

Scope of Work

This contract requires the connection of an existing outdoor commercial ice machine to Building 33805. Key tasks include:

  • Site Survey: Determine optimal routes for water supply and drainage, identify obstacles, and material lengths.
  • Electrical Connection: Install breakers, connect to the ice maker disconnect, install surface-mounted conduit, an outdoor NEMA disconnect, and a grounding system compliant with NEC 2023.
  • Water Supply Line Installation: Tap into the domestic cold-water pipe in scrub room 166, route new copper or PEX lines to the ice machine, install pipe sleeves, isolation valves, and insulate lines per International Plumbing Code 2024.
  • Drainage System Installation: Connect PVC pipe assembly to ice machine drain outlets, route to scrub room 166 sanitary drain system, install a drain pit with a sump pump, and pipe to the closest drain line within the existing pipe chase. Note: Previous guidance on cutting concrete for drainage is superseded; installing a drain line across concrete with a speed bump cover is not acceptable.
  • Finishes & Restoration: Repair damaged interior/exterior finishes, backfill excavated trenches, repair concrete, restore landscaping, and install safety bollards.
  • Testing & Documentation: Pressure test water lines, verify drainage, perform electrical tests, obtain necessary permits, and provide a one-year warranty.

Contract & Timeline

  • Contract Type: Combined Synopsis/Solicitation, Non-personal services, Firm Fixed Price.
  • Set-Aside: Total Small Business (FAR 19.5).
  • Product/Service Code: N099 (Installation Of Equipment: Miscellaneous).
  • Period of Performance: April 1, 2026, to April 30, 2026.
  • Place of Performance: Fort Gordon, GA 30905.
  • Mandatory Site Visit: March 23, 2026, at 9:30 A.M.
  • Proposal Due Date: Monday, March 30, 2026, at 4:00 PM.
  • Published Date: March 28, 2026.

Submission & Evaluation

  • Offer Submission: Proposals must be emailed and offerors are responsible for verifying receipt.
  • Evaluation Factors: Technical, Past Performance, and Price.
  • Proposal Validity: Offers must be valid for 30 calendar days from the submission date.
  • Technical Approach: The technical approach section must detail the methodology for accomplishing SOW tasks and not merely restate requirements.
  • Amendments: Amendment 001 consolidated vendor questions and answers, provided Addendum 52.212-1, and extended the proposal due date.

Contact Information

People

Points of Contact

Nina RachalPRIMARY
Shecoriya ByrdSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Mar 28, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 16, 2026
View