INDICATOR,FAULT LOC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Mechanicsburg has issued a solicitation for INDICATOR,FAULT LOC (PSC 6625 - Electrical And Electronic Properties Measuring And Testing Instruments). This opportunity, issued under SEPA-EAF Authority, seeks bids for the manufacture and supply of these indicators. Quotes are due by May 13, 2026.
Scope of Work
The contract requires the manufacture and supply of "INDICATOR,FAULT LOC" in accordance with specified technical requirements. Key aspects include compliance with MIL-STD-130 for marking and MIL-STD-1686 for electrostatic discharge control. A critical requirement is that all materials furnished must be mercury-free, as they are intended for use on submarines and surface ships. The contractor will be responsible for performing all inspection requirements, with records maintained for 365 days post-delivery.
Contract & Timeline
- Type: Solicitation (Supply Contract)
- Set-Aside: None (Unrestricted)
- Response Due: May 13, 2026
- Published: May 8, 2026 (latest amendment date)
Evaluation
Award will be made using the Lowest Price Technically Acceptable (LPTA) criteria, as per DFARS 215.101-2-70(a)(1)(i).
Key Requirements & Notes
Only authorized distributors of the original manufacturer's item will be considered, and proof of authorization must be submitted with the offer. If the offeror is not the manufacturer, the Original Equipment Manufacturer (OEM) CAGE code and part number must be provided. Drawings or technical data for this item are not available. Offerors must provide quantity breaks with their quotes. All contractual documents will be issued electronically, and electronic submittal of Invoice and Receiving Report (COMBO) through PIEE-WAWF is mandatory. Changes to production facilities require Contracting Officer approval and a $250 price reduction to cover administrative costs.