Industry Feedback Requested: USACE’s Progressive Design Build with Other Transaction Authority Process

SOL #: 3b42f8b867a34a0ea715d6ec6192ad76Special Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
US ARMY CORPS OF ENGINEERS

Place of Performance

Place of performance not available

NAICS

No NAICS code specified

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Jun 16, 2026
2
Action Date
Jul 8, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE) is requesting industry feedback on its developed procedures for executing Progressive Design Build (PDB) for military construction projects using an Other Transaction Authority (OTA) procurement method. This special notice aims to refine USACE's approach and align it with commercial practices. Feedback is due by July 8, 2026, 4 PM Eastern.

Purpose & Scope

USACE is developing a new process for military construction (MILCON) projects, combining the collaborative Progressive Design Build (PDB) delivery method with the flexibility of Other Transaction Authority (OTA). PDB involves selecting a design-builder based on qualifications, followed by a collaborative design and preconstruction phase to establish a Guaranteed Maximum Price (GMP) before construction. OTAs are legally binding agreements not subject to the Federal Acquisition Regulation (FAR), authorized for certain facility construction under 10 U.S.C. § 2808a. USACE seeks industry input to improve these procedures.

Key Documents for Feedback

Four attachments are provided for review and feedback:

  • Attachment A: Placemat - PDB with OTA Process Overview: Provides a general overview of the end-to-end PDB w/OTA process for MILCON projects, detailing a two-phase approach (Design & Preconstruction Services; Final Design & Construction) and emphasizing collaboration and decision gateways.
  • Attachment B: Playbook - Executing PDB with OTA: A guide for USACE Project Delivery Teams on executing PDB w/OTA construction projects, outlining the phased approach, procurement process, roles, responsibilities, and administrative framework.
  • Attachment C: Agreement Articles - PDB with OTA: A comprehensive set of draft terms and conditions for a PDB Other Transaction Agreement, covering definitions, scope, payment, bonding, dispute resolution, data rights, and specific PDB responsibilities.
  • Attachment D: PDB with OTA Industry Questionnaire: Contains specific questions for industry regarding GMP, payment terms, bonding, small business teaming, Phase 1 off-ramps, and alignment with industry best practices.

How to Provide Feedback

Industry responses and questions must be submitted via "Bidder Inquiry" in ProjNet using BIDDER INQUIRY KEY: HA6G6E-34M6NF. Separate entries should be submitted for each response to Attachment D questions. Respondents should review existing inquiries before submitting new ones and avoid proprietary or sensitive information. Firms interested in one-on-one meetings for further dialogue should indicate their interest in their response.

Contract & Timeline

  • Type: Special Notice (Industry Feedback Request)
  • Set-Aside: None specified
  • Response Due: July 8, 2026, 4 PM Eastern
  • Published: June 16, 2026

People

Points of Contact

Brooke PattersonPRIMARY
Scott HelmerSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Special Notice
Posted: Jun 16, 2026
Industry Feedback Requested: USACE’s Progressive Design Build with Other Transaction Authority Process | GovScope