Integrated Solid Waste Management Bulk Waste at Marine Corps Installations Pacific (MCI-PAC) Camp Smedley D. Butler, Okinawa Japan

SOL #: N4008426R2001Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM FAR EAST
FPO, AP, 96349-0013, United States

Place of Performance

JP-47, Japan

NAICS

Solid Waste Collection (562111)

PSC

Trash/Garbage Collection Services Including Portable Sanitation Services (S205)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 11, 2025
2
Last Updated
Mar 26, 2026
3
Submission Deadline
Apr 14, 2026, 1:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM FAR EAST, has issued a Solicitation for Integrated Solid Waste Management Bulk Waste services at Marine Corps Installations Pacific (MCI-PAC) Camp Smedley D. Butler, Okinawa, Japan. This is an UNRESTRICTED opportunity for a Firm Fixed-Price (FFP) Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract. Proposals are due by April 14, 2026.

Scope of Work

The contract requires all labor, supervision, management, tools, materials, equipment, facilities, transportation, and incidental engineering for the collection and disposal of bulk waste. Services include recurring tasks such as Bulk Waste Area Operations, Solid Waste Disposal (non-recyclable and recyclable), provision of Vehicles and Equipment, Solid Waste Containers, and Container Delivery and Pick-up for various locations including MCB, 78th Signal Battalion, and DODEA. Non-recurring work covers Asbestos Sampling and One-time Disposal of Asbestos Containing Material (ACM). The Performance Work Statement (PWS) has been revised to clarify categories of debris and waste, including E-waste and medical waste, though medical waste disposal has been removed from non-recurring Exhibit Line Item Numbers (ELINs).

Contract & Timeline

  • Contract Type: Firm Fixed-Price (FFP), Indefinite-Delivery/Indefinite-Quantity (IDIQ)
  • Period of Performance: A twelve (12) month Base Period (August 1, 2026 - July 31, 2027) followed by seven (7) one-year Option Periods (August 1, 2027 - July 31, 2034).
  • Pricing: Proposals must be priced in Japanese Yen, utilizing the detailed ELINs (Rev2) provided.
  • Proposal Due Date: April 14, 2026, at 01:00:00Z.
  • Published Date: March 26, 2026 (latest amendment).

Set-Aside

This acquisition is UNRESTRICTED. The NAICS code is 562111 with a size standard of $20.5 Million.

Evaluation Factors

Award will be based on a Lowest Price Technically Acceptable (LPTA) methodology. Evaluation factors include Price Proposal and Non-Price (Technical) Proposal, specifically:

  • Factor 1: Management Plan
  • Factor 2: Corporate Experience (Revised)
  • Factor 3: Safety
  • Factor 4: Past Performance An "ACCEPTABLE" rating is required for all non-price factors. Corporate Experience requirements have been updated, allowing offerors to combine up to eight projects, with a minimum of one project required for an acceptable rating. Relevant projects are defined by scope, complexity, magnitude (JPY 120,000,000 annual value), and recency (within the past 10 years).

Key Requirements & Submission Impact

Offerors must be registered in the System for Award Management (SAM) with active Representations and Certifications, registered to do business in Japan, and possess all required permits. Cybersecurity Maturity Model Certification (CMMC) Level 1 (Self) is required by November 2025. Foreign entities may need to complete IRS Form W-14. Bidders must use the revised Experience Form (Attachment 4) and Past Performance Questionnaire (PPQ-0). Amendment 0003 provided Government responses to inquiries, revised PWS and ELINs, and extended the proposal due date.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View
View
View
View

Versions

Version 7Viewing
Solicitation
Posted: Mar 26, 2026
Version 6
Solicitation
Posted: Feb 27, 2026
View
Version 5
Solicitation
Posted: Feb 11, 2026
View
Version 4
Solicitation
Posted: Feb 11, 2026
View
Version 3
Solicitation
Posted: Feb 1, 2026
View
Version 2
Solicitation
Posted: Jan 30, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 11, 2025
View
Integrated Solid Waste Management Bulk Waste at Marine Corps Installations Pacific (MCI-PAC) Camp Smedley D. Butler, Okinawa Japan | GovScope