JBSA Lackland Remove and Replace Golf Cart Bridge

SOL #: FA301626Q0043Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3016 502 CONS CL
JBSA LACKLAND, TX, 78236-5286, United States

Place of Performance

DWG, TX

NAICS

Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance (811310)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Prefabricated Structures And Scaffolding (J054)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 23, 2026
2
Last Updated
Apr 3, 2026
3
Submission Deadline
Apr 14, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting quotes for the removal and replacement of the Hole 18 Golf Cart Bridge (B490) at Joint Base San Antonio (JBSA) Lackland, TX. This is a Total Small Business Set-Aside acquisition. The project aims to provide a structurally sound, ADA-compliant prefabricated bridge for safe pedestrian and golf cart conveyance. Quotes are due by April 14, 2026, at 10:00 AM CST.

Scope of Work

The contractor will be responsible for:

  • Site Preparation: Removal and off-site hauling of the existing bridge, preparation of concrete abutments, installation of ADA-compliant concrete approaches, landscape shoring, retaining wall blocks, and vegetation removal.
  • Bridge Structure: Furnishing and installing a prefabricated steel bridge, at least 8ft wide and 85’ long, with a black preventative compound, corrosion-resistant steel rails (42” high), and an 8-ton load capacity.
  • Bridge Decking: Utilizing pressure-treated Douglas Fir wood for the decking.
  • Cleanup & Restoration: Avoiding damage to existing structures, spreading/leveling removed soil, installing silt barriers, daily worksite cleanup, and restoring the site to its original condition.
  • Period of Performance: 120 days, with work generally expected during normal base hours (7:30 a.m. - 4:30 p.m.).

Contract Details

  • Contract Type: Request for Quote (RFQ) / Firm Fixed Price
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Place of Performance: JBSA Lackland, TX
  • Product Service Code: J054 - Maintenance, Repair And Rebuilding Of Equipment: Prefabricated Structures And Scaffolding
  • Wage Determination: Compliance with Wage Determination No. 2015-5253, Revision 28, for Texas counties is required.

Submission & Evaluation

  • Quote Submission: Email responses to Miranda Garza (miranda.garza.2@us.af.mil) and Lauren Macias (lauren.macias.1@us.af.mil).
  • Required Information: Quotes must include company name, Cage Code, UEI #, POC, telephone #, Tax ID#, E-Mail Address, warranty information, and WAWF invoicing capability. A detailed technical plan outlining methodology, approach, and proposed solution is mandatory.
  • Evaluation Criteria: Award will be made to the technically acceptable lowest priced quote, representing the best value. The technical approach and timeline will be evaluated, ensuring the ability to start performance within 10 days of award and complete within the 120-day period.
  • SAM Registration: Required for award eligibility.

Key Dates

  • Questions Due: Thursday, April 2, 2026, at 12:00 PM CST (already passed)
  • Quotes Due: Tuesday, April 14, 2026, at 10:00 AM CST
  • Published Date: April 3, 2026 (Amendment)
  • Site Visit: A site visit was held on Tuesday, March 31, 2026, at JBSA Lackland.

People

Points of Contact

Miranda GarzaPRIMARY
Lauren MaciasSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 23, 2026
View
JBSA Lackland Remove and Replace Golf Cart Bridge | GovScope