JOFOC for SSC Tornado Resiliency - Generator Replacement for Test Complex

SOL #: 80SSC026F0007Justification

Overview

Buyer

National Aeronautics And Space Administration
National Aeronautics And Space Administration
NASA STENNIS SPACE CENTER
STENNIS SPACE CENTER, MS, 39529, United States

Place of Performance

Stennis Space Center, MS

NAICS

Electric Power Distribution (221122)

PSC

Electric Services (S112)

Set Aside

No set aside specified

Timeline

1
Posted
May 19, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Aeronautics and Space Administration (NASA) Stennis Space Center has posted a Justification for Other Than Full and Open Competition (JOFOC) for the SSC Tornado Resiliency - Generator Replacement for Test Complex project (80SSC026F0007). This JOFOC outlines the rationale for a sole-source Task Order award to Mississippi Power Co (MPC) against GSA Areawide Public Utility Contract 47PA0425D0027.

Scope of Work

The project involves the major restoration and replacement of generators at SSC's Test Complex, specifically at B-4400. Key requirements include:

  • Replacement of four existing 1.5MW, 4160V generators with new 480V generators capable of delivering a maximum of 3.5MW emergency power (2x1750kW configuration).
  • Performing a load study for generator sizing.
  • Providing necessary equipment: 15kV breaker, 480V step-up transformers, NEMA 3R Low Voltage switchgear/equipment, and relays.
  • Integrating new generators with day-tanks, existing B-4400 diesel storage tanks, and new piping/transfer pumps.
  • Including provisions for connecting a spare/portable generator.
  • Connecting new generators to the site Emergency Management and Control System (EMCS) and B-4400 Control room for monitoring.
  • Ensuring new generators can synchronize with the utility power grid.
  • Replacing existing knife-blade switches on Circuits 11 and 21 with new Gang-Operated Air Break (GOAB) switches.
  • Replacing sand fuses feeding B-4400 480VAC transformers.

Contract & Timeline

  • Type: Justification for Other Than Full and Open Competition (JOFOC) for a sole-source Task Order.
  • Contract Vehicle: GSA Areawide Public Utility Contract 47PA0425D0027.
  • Estimated Completion: 30 months.
  • Published Date: May 19, 2026.

Eligibility / Set-Aside

This acquisition is justified for other than full and open competition, citing 10 U.S.C. 3204(a)(1) and FAR 6.103-1. The rationale is that Mississippi Power Co (MPC) is the only entity with the legal authority and technical control over its distribution system required for secure and reliable integration of the new generators.

Evaluation

This document is a justification for a sole-source award, not a solicitation for proposals. The contracting officer will perform a proposal analysis to ensure the final price is fair and reasonable.

Additional Notes

The existing generators have been in service for 56 years and are considered outdated and unreliable. This project is ancillary to the electric service already provided by MPC. NASA will continue to examine the market for future alternative solutions or new sources.

People

Points of Contact

Rachel ClaytonPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Justification
Posted: May 19, 2026
JOFOC for SSC Tornado Resiliency - Generator Replacement for Test Complex | GovScope