Lake Alva Campground Improvements

SOL #: 1240LU26Q0055Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
LOLO NATIONAL FOREST
MISSOULA, MT, 59804, United States

Place of Performance

Seeley Lake, MT

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Repair Or Alteration Of Recreation Facilities (Non Building) (Z2PA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 29, 2026
2
Last Updated
May 29, 2026
3
Submission Deadline
Jun 8, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Forest Service, Lolo National Forest, under the Department of Agriculture, is soliciting proposals for Lake Alva Campground Improvements located approximately 60 miles north of Missoula, MT, near Seeley Lake. This Total Small Business Set-Aside opportunity involves comprehensive upgrades to the campground's infrastructure, with an estimated project magnitude between $500,000 and $1,000,000. Proposals are due by June 8, 2026, at 1500 MDT.

Scope of Work

This project entails the replacement of the existing water system, electrical system, and repaving of a loop within the Lake Alva Campground.

  • Water System: Includes replacing all components in the well pumphouse (pressure tanks, flow meter, valves), installing a new 2" HDPE water main throughout the campground, and abandoning the existing main.
  • Electrical System: Involves demolition of existing equipment, new grounding, low-voltage power conductors, cable conduit, box connectors, installation of new power outlet pedestals, and new circuit breakers.
  • Pavement Improvements: An optional item includes repaving sections of the campground asphalt road, patching areas where the new water main intersects, and replacing existing wheel stops. Detailed construction plans (Attachment 4) and technical specifications (Attachment 5) provide comprehensive requirements for site construction, concrete work, electrical systems, and water distribution systems, including HDPE piping and seeding.

Contract Details

This is a Firm Fixed-Price contract, with the government intending to make one award. The Period of Performance is scheduled from July 1, 2026, to December 1, 2027. Bidders must adhere to the prevailing wage rates for heavy construction in Missoula County, Montana, as specified in Wage Determination MT20260067 (Attachment 6).

Submission & Evaluation

Quotations must be submitted via email to john.curry@usda.gov. Required submission documents include:

  • Price Schedule (Attachment 2)
  • Past Performance/Experience Questionnaire (Attachment 7)
  • Written Technical Approach/Performance Schedule
  • Bid Guarantee (20% of total bid) Evaluation will be based on a comparative analysis to determine the best value, considering Relevant Experience, Past Performance, Technical Approach, and Price. Offerors must hold prices firm for 90 calendar days. Performance and Payment Bonds (100% of award price) will be required within 10 days after award.

Important Dates & Contacts

  • Proposal Due Date: June 8, 2026, at 1500 MDT.
  • Site Visit: May 13, 2026, at 10 am at the Seeley Lake Ranger District. Questions for the site visit can be directed to Brian Story at (406) 529-8534 or brian.story@usda.gov.
  • Primary Contact: John Curry, john.curry@usda.gov, 6056739216.

Amendments & Clarifications

Amendment 1 extended the quote deadline to June 8, 2026, and posted a list of Questions & Answers (Q&As). These Q&As clarify aspects such as logging contract overlap, material removal, acceptable fusion methods, backfill, topsoil usage, and RV host site availability. A question regarding potential campground closure is still pending further government response.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: May 29, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 28, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: May 26, 2026
Version 2
Combined Synopsis/Solicitation
Posted: May 26, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Lake Alva Campground Improvements | GovScope