LIFTING ADAPTER,SPE
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support (WSS) Mechanicsburg, is soliciting quotes for a LIFTING ADAPTER, SPE. This opportunity is a Total Small Business Set-Aside. The solicitation has been amended to update the Point of Contact and re-open for quotes. Updated bids are due by Thursday, April 23, 2026.
Scope of Work
This solicitation is for the procurement of a LIFTING ADAPTER, SPE. The detailed technical requirements, including the Individual Repair Part Ordering Data (IRPOD), drawings, technical data, and military specifications, are available on the HTTPS://LOGISTICS.UNNPP.GOV/ECOMMERCE website, which requires pre-registration and a password.
Contract & Timeline
- Opportunity Type: Solicitation
- Set-Aside: Total Small Business
- Response Due: April 23, 2026, by 8:30 PM ET
- Published Date: March 24, 2026 (Amendment)
- Original Publication: January 22, 2026 (implied by document 'See Solicitation N0010426QBJ44')
Key Requirements & Instructions
- Technical Documentation: Access required documents (IRPOD, drawings, specs) via HTTPS://LOGISTICS.UNNPP.GOV/ECOMMERCE. These documents are NOT RELEASABLE TO FOREIGN NATIONALS (NOFORN) and are subject to special export controls.
- Order of Precedence: In case of conflict, amendments take precedence, followed by the schedule of supplies, terms and conditions, IRPOD, STRs, drawings, and specifications.
- Document Revisions: Contractors must comply with specified document revisions. Written approval from the Contracting Officer is required for using alternative revisions or portions of documents.
- Waivers/Deviations: Requests for delivery date extensions or non-compliance waivers must be submitted in advance with justification and an offer of consideration.
- Quality Assurance: Requirements are detailed in the IRPOD. Contractors must maintain an inspection system acceptable to the Government.
- Packaging: Adherence to MIL-PRF-23199, MIL-DTL-24466, and MIL-STD 2073 is required, with specific clarifications regarding cleanliness controls. Fire retardant packaging is no longer required.
- Certificate of Compliance: A Certificate of Compliance (per DI-MISC-81356) must be submitted at the time of material delivery for each unique combination of contract, NSN, and item nomenclature.
- Mercury Exclusion: No intentional addition or contact of mercury or mercury-containing compounds with hardware or supplies.
Additional Notes
The Point of Contact has been updated. Pricing for quotations is generally valid for 60 days after the closing date, unless otherwise specified by the bidder. Nuclear Reactor Publications not available on the e-commerce site must be requested from NAVSUP WSS-MECH CODE N943, requiring "need-to-know" certification.