LMI RELAY / DISPLAY / CABLE
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Defense, Defense Logistics Agency (DLA) Maritime - Puget Sound has issued an Award Notice for LMI Relay / Display / Cable components. This procurement, identified as a Total Small Business Set-Aside, involves the acquisition of various LMI parts and cable assemblies, primarily justified as sole-source procurements due to their critical role as Original Equipment Manufacturer (OEM) replacements for existing crane systems (Cranes 51, 52, 53, 54) in Bremerton, WA.
Scope of Work
The requirement is for specific LMI components and cable assemblies, justified as sole-source procurements to ensure compatibility and safety with existing brand-name equipment. Key items include:
- LMI Relay (P/N: LMC-0001-120)
- LMI Display Controller/Display (P/N: SD50LT-SSA12001-002)
- LMI Converter (P/N: A2C01-001, Model: SIO300)
- Various LMI Cable Assemblies (P/N: CBL7123-F01B0101-020, CBL7024-M01B0101-020, CBL7022-M01B0101-008, CBL7022-M01F0101-010) These parts are essential for maintaining the original configuration of Cranes 51, 52, 53, and 54, with any deviation posing potential risks to crane employees. McCoy Global USA is identified as the manufacturer for several of these OEM parts.
Contract Details
This is an Award Notice for electrical control equipment (PSC 6110). Payment will be made via WAWF, with a QA 4 - 7 days inspection level. Delivery is expected by September 30, 2026. Each sole-source justification for individual components estimates costs between $15,000 and $350,000.
Set-Aside & Justification
While the overall opportunity is designated as a Total Small Business Set-Aside (FAR 19.5), several key components within this procurement were justified as sole-source acquisitions. This was due to the proprietary nature of the parts and the critical need for direct OEM replacements to ensure form, fit, and function compatibility with existing crane systems, precluding full and open competition for these specific items.
Additional Notes
Contractors will require a Defense Biometric Identification System (DBIDS) credential for base access. All deliveries must pass through the base Truck Inspection Station. Supply chain traceability documentation and Vendor Shipment Module (VSM) for shipping documentation are required. The place of performance is Bremerton, WA.