M--Boardwalk Replacement @ CUVA

SOL #: 140P6426B0005Solicitation

Overview

Buyer

Interior
National Park Service
MWR OHIO(64000)
Macedonia, OH, 44067, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Operation Of Other Non Building Facilities (M1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 10, 2026
2
Last Updated
May 11, 2026
3
Submission Deadline
May 27, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service (NPS) is soliciting bids for the Boardwalk Replacement project at Cuyahoga Valley National Park (CUVA). This Total Small Business Set-Aside opportunity involves the demolition of existing structures and new construction of a boardwalk. The solicitation has been amended multiple times, with the final bid due date extended to May 27, 2026, at 12:00 PM ET.

Scope of Work

This project requires providing all labor, materials, tools, and equipment for the removal and demolition of existing boardwalk structures and the new construction of a boardwalk at the Stumpy Basin Towpath Trail. Key elements include:

  • Installation of helical piles, timber decking, and framing.
  • A bid alternate for 3x treated S1S rough cut decking lumber.
  • Specific requirements for planting 60 trees (20 of each of 3 species: American Sycamore, Boxelder, Silver Maple), 1-inch caliper, within disturbance limits.
  • Clarifications on timber dimensions, treatment, and material changes for APVA21 angle connectors (Hot-Dip Galvanized or equivalent, not stainless steel).
  • Work is in an environmentally sensitive area (wetland, floodplain, cultural landscape), prohibiting vehicles/equipment on grade in protected areas.
  • Trail rehabilitation and natural landscape restoration are required at both ends.

Contract Details

  • Type: Firm-Fixed Price contract.
  • Magnitude of Construction: Estimated between $1M and $3M.
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) with a $45 Million size standard.
  • Set-Aside: Total Small Business Set-Aside.
  • Period of Performance: 270 calendar days after issuance of the Notice to Proceed (revised from 180 days).
  • Anticipated Start: Spring/Summer 2026.

Submission & Evaluation

  • Bids must be submitted electronically via email to craig_bryant@ios.doi.gov.
  • A Bid Guarantee of 20% of the bid price (not to exceed $3M) is required.
  • Offerors must be registered in SAM.gov and acknowledge all solicitation amendments (SF30 or SF1442).
  • The Bid Schedule and Price Schedule Worksheet must be used, providing pricing for all base and option line items.
  • Compliance with the "Limitations on Subcontracting" clause and Davis-Bacon Act prevailing wage rates (Wage Determination - Summit Co.) is mandatory.

Key Updates & Deadlines

  • Bid Due Date: May 27, 2026, at 12:00 PM ET (extended via Amendment 0002).
  • Posted: May 11, 2026.
  • Amendment 0002 posted Questions & Answers and an Addendum to Specifications (May 6, 2026).
  • A site visit was held on April 15, 2026.

Additional Notes

Bidders are strongly urged to review the comprehensive drawings, specifications, and all amendments, especially regarding material changes and the revised period of performance, to ensure a compliant and competitive proposal.

People

Points of Contact

Bryant, CraigPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Solicitation
Posted: May 11, 2026
Version 4
Solicitation
Posted: Apr 21, 2026
View
Version 3
Solicitation
Posted: Mar 27, 2026
View
Version 2
Pre-Solicitation
Posted: Feb 24, 2026
View
Version 1
Sources Sought
Posted: Feb 10, 2026
View
M--Boardwalk Replacement @ CUVA | GovScope