Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet, New York Beach Erosion Control and Navigation Project

SOL #: W912DS26BA015Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NEW YORK
NEW YORK, NY, 10278-0004, United States

Place of Performance

Gilgo Beach, NY

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Dredging Facilities (Y1KF)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 13, 2026
2
Last Updated
Apr 27, 2026
3
Response Deadline
Apr 12, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE), New York District, has issued a Presolicitation for Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet, New York Beach Erosion Control and Navigation Project. This project involves significant dredging and beach nourishment activities, with an estimated cost between $25,000,000 and $100,000,000. This is an Unrestricted Procurement.

Scope of Work

The work entails dredging the Fire Island Inlet Federal Navigation channel and deposition basin to a depth of up to 14 feet (plus 2 feet over-depth). The dredged sand, up to 2,500,000 cubic yards, will be placed as nourishment along the designated feeder beach at Gilgo Beach, Suffolk County, New York. The project aims to alleviate shoaling, maintain authorized navigation dimensions for commercial and recreational boating, and provide coastal storm risk management by renourishing the shoreline and protecting Ocean Parkway. The work requires a large pipeline dredge meeting US Coast Guard criteria for an "ocean going vessel." The contractor must maintain a placement production rate of at least 14,500 cubic yards per calendar day.

Contract & Timeline

  • Type: Presolicitation (future contract expected to be for construction/dredging)
  • Set-Aside: Unrestricted Procurement
  • Estimated Cost: $25,000,000 - $100,000,000
  • Work Duration: Basic work to be completed within 180 calendar days after Notice to Proceed (NTP), with commencement within 5 calendar days of NTP.
  • Liquidated Damages: $2,770.00 per calendar day of delay.
  • Plans & Specifications Available: June 2026
  • Bid Opening: July 2026
  • Anticipated Award: August 2026
  • Anticipated NTP: Late September 2026
  • Response Date for Presolicitation: April 12, 2026

Place of Performance

Gilgo Beach, Suffolk County, New York.

Contact Information

People

Points of Contact

Nicole C. FauntleroyPRIMARY
Nicholas P. EmanuelSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 2
Pre-Solicitation
Posted: Apr 27, 2026
View
Version 1Viewing
Pre-Solicitation
Posted: Apr 13, 2026
Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet, New York Beach Erosion Control and Navigation Project | GovScope