MIDDLE MISSISSIPPI RIVER STONE DIKE ALTERATION (NESP)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to perform Middle Mississippi River Stone Dike Alteration (NESP). This Solicitation involves the repair, modification, and construction of river training structures. Amendment 0001 has been issued, providing government answers to bidder inquiries and revising Section 3.3.2 of the specifications. The response deadline is June 1, 2026, at 10am CST.
Scope of Work
The work requires furnishing all plant, labor, material, and equipment for the repair of existing or construction of new stone structures, revetments, notching, or removal of existing structures. Specifically, it involves modifying and constructing river training structures in the Mississippi River near Herculaneum, Missouri, and Ste. Genevieve, Missouri. The project spans two ten-mile reaches of the river, including modifying 44 structures and constructing two new structures entirely from recycled stone from the modified structures. No new stone material will be required. Work is anticipated to use traditional river marine construction equipment, such as floating plant and barge-mounted cranes.
Contract & Timeline
- Type: Solicitation
- Product Service Code: Y1PZ (Construction Of Other Non Building Facilities)
- Set-Aside: None specified
- Response Due: June 1, 2026, at 10am CST
- Published: May 20, 2026
- Department/Agency: DEPT OF DEFENSE / DEPT OF THE ARMY / W07V ENDIST ST LOUIS
Amendment Details
Amendment 0001 provides Government answers to Bidder Inquiries and a revision to Section 3.3.2 No Work Stages of the specifications. It also removes DFARS Clause 252.215-7009 and adds FAR Clause 52.222-34 as a full text. The response deadline remains unchanged.
Contact Information
- Primary Contact: ABRIELLE CAMPBELL
- Email: abrielle.campbell@usace.army.mil
- Phone: 314-331-8690