Milli-Kelvin Scanning Probe Microscope

SOL #: BSA473768Solicitation

Overview

Buyer

Energy
Energy, Department Of
BROOKHAVEN NATL LAB -DOE CONTRACTOR
Upton, NY, 11973, United States

Place of Performance

Upton, NY

NAICS

Analytical Laboratory Instrument Manufacturing (334516)

PSC

Physical Properties Testing And Inspection (6635)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 17, 2026
2
Last Updated
Apr 2, 2026
3
Submission Deadline
Apr 18, 2026, 4:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

Brookhaven Science Associates (BSA), operating Brookhaven National Laboratory (BNL) for the U.S. Department of Energy, is soliciting quotes for a Milli-Kelvin Scanning Probe Microscope (mK-SPM). This Firm Fixed-Price contract is for full and open competition to procure an advanced instrument for nanoscience research at the Center for Functional Nanomaterials in Upton, NY. The award will be based on the lowest total price from a responsive and responsible offeror meeting all technical requirements.

Scope of Work

The mK-SPM must operate tuning-fork-based atomic force microscopy (TF-AFM) and support scanning Microwave Impedance Microscopy (sMIM) and Scanning Resonator Microscopy (SRM). Key specifications include operation at a base temperature of <= 20 mK within a fully shielded, low-noise, high-vacuum environment, compatibility with a cryogen-free dilution refrigerator, non-magnetic design, and static/adjustable magnetic fields. Performance standards require Z vibrational noise <= 3 nm RMS and detectable tuning fork amplitude <= 1 nm.

Key deliverables include a Program Plan, Technical and Progress Teleconferences, Performance Reports, Final Technical Design, Equipment Footprint and Laboratory Requirements, Installation Work Plan, Factory Acceptance Testing (FAT), Delivery, Site Acceptance Test and Commissioning Report, Training, and an End Item Documentation Package. The contractor is responsible for installation and on-site commissioning, with BSA providing riggers for unloading.

Contract Details

  • Contract Type: Firm Fixed Price
  • Period of Performance: Effective from execution date through December 15, 2027
  • Anticipated Delivery: Estimated 92 weeks After Receipt of Order (ARO)
  • Payment Terms: Net 30 for Large/Foreign Businesses, Net 10 for Small Businesses; milestone-based payments.
  • NAICS Code: 334516 (Size Standard: 1000 employees)
  • Set-Aside: Full and Open Competition

Submission & Evaluation

Offerors must demonstrate previous experience fabricating and testing mK-SPM systems of comparable complexity, maintain a capable development team, possess a comprehensive U.S. instrument support network, and have a robust Quality Assurance program (ISO 9001 or similar).

Proposals must be submitted via email and include the signed Quotation Pricing Sheet (Enclosure C). Required forms include the Draft Purchase Order/Contract (A), AMS Form 050 Reps and Certs (B), Vendor ACH Authorization Form (D), and either W-9 (E) or W-8 (F) for foreign vendors. Offerors must be registered in SAM.gov; foreign vendors are exempt from SAM registration but must complete AMS-Form-050. A Small Business Subcontracting Plan may be required for offers exceeding $900,000.

Key Dates

  • Questions Due: April 2, 2026
  • Quote Due: April 18, 2026

Contact Information

People

Points of Contact

Mark BrockPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Apr 2, 2026
Version 2
Pre-Solicitation
Posted: Apr 2, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 17, 2026
View
Milli-Kelvin Scanning Probe Microscope | GovScope