Minot AFB Flooring MACC FY26

SOL #: FA452826R0001Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4528 5 CONS
MINOT AFB, ND, 58705, United States

Place of Performance

Minot AFB, ND

NAICS

Flooring Contractors (238330)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 12, 2026
2
Submission Deadline
Jul 6, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for a Multiple Award Construction Contract (MACC) to provide flooring installation, repair, and replacement services at Minot Air Force Base, North Dakota. This is a 100% Small Business Set-Aside acquisition under NAICS code 238330. The government intends to award approximately three (3) to five (5) Firm-Fixed-Price Indefinite-Delivery, Indefinite-Quantity (IDIQ) contracts. Proposals are due July 6, 2026, at 1:00 PM local time.

Scope of Work

Contractors will provide comprehensive flooring services, including installation, repair, and replacement of various commercial flooring types (Vinyl, Carpet, Ceramic Tile, Resinous/Epoxy). Services will be defined through individual Task Orders. A Mock Seed Project for Building 475 is included, detailing carpet tile replacement in specific rooms and hallways, and vinyl flooring installation in other areas, serving as a basis for technical evaluation and initial pricing.

Contract Details

  • Contract Type: Firm-Fixed-Price Multiple Award Construction Contract (MACC) with Indefinite-Delivery, Indefinite-Quantity (IDIQ) task orders.
  • Period of Performance: Three (3) year base ordering period with one (1), two (2) year option ordering period.
  • Estimated Value: Total aggregate ceiling for all orders is $4,999,999.00. Each contract has a guaranteed minimum of $500.00.
  • Set-Aside: 100% Small Business Set-Aside (NAICS 238330, $19.0 Million size standard).
  • Awards: Intent to award 3-5 contracts, with on-ramp/off-ramp procedures.

Submission & Evaluation

Proposals must be submitted electronically to 5CONS.PKAC.FlooringMACC@us.af.mil by July 6, 2026, 1:00 PM local time. The acquisition uses a Best Value Tradeoff process, evaluating proposals on three factors:

  1. Technical Capability: Rated Acceptable/Unacceptable, covering diverse material competency, a realistic Mock Seed Project Execution Plan, and qualified Key Personnel (Project Manager, Site Superintendent).
  2. Past Performance: Assessed for recent and relevant performance, requiring submission of a Past Performance Questionnaire (PPQ) template (Attachment 10) and Subcontractor Consent Letters (Attachment 12) if applicable.
  3. Price: Evaluated for reasonableness, completeness, and unbalanced pricing based on the Total Evaluated Price (TEP) using "Attachment 9 - Pricing Schedule" Excel workbook.

Offerors must also submit a completed SF 1442, current SAM.gov representations, and a Financial Responsibility Authorization Letter (Attachment 11).

Key Dates & Contacts

Important Notes

  • Performance and Payment Bonds are required within 10 calendar days after award.
  • The Davis-Bacon Act Wage Determination ND20260031 (Attachment 6) applies, outlining prevailing wage rates for various construction classifications.
  • Funds are not presently available; award is contingent upon fund availability.
  • Attachments 1 and 3 are protected PDF files and are inaccessible with standard viewers.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 12, 2026
Minot AFB Flooring MACC FY26 | GovScope