Mirror Benders

SOL #: SLAC_360851-ACombined Synopsis/Solicitation

Overview

Buyer

Energy
Energy, Department Of
SLAC Natl Accel Lab -DOE Contractor
Menlo Park, CA, 94025, United States

Place of Performance

Place of performance not available

NAICS

Analytical Laboratory Instrument Manufacturing (334516)

PSC

Laboratory Equipment And Supplies (6640)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 30, 2026
2
Last Updated
May 27, 2026
3
Submission Deadline
Jun 10, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

SLAC National Accelerator Laboratory, a Department of Energy contractor, is soliciting Firm Fixed Price proposals for the fabrication and delivery of LCLS-II-HE Mirror Benders. This opportunity, identified as RFP 360851-A(GN), is for the Linac Coherent Light Source II High-Energy (LCLS-II-HE) project. Proposals are due by Tuesday, June 9, 2026, at 5:00 PM PST.

Scope of Work

The requirement is for the supply of eight (8) mirror bender assemblies and associated components for the Dynamic X-ray Scattering (DXS), Coherent X-ray Imaging (CXI), and Macromolecular Femtosecond Crystallography (MFX) beamlines. The scope includes fabrication (or procurement) and delivery, adhering to detailed engineering specifications (LCLSII-HE-1.4-ES-1074-R0) for mirror shape control, environmental compatibility, and design requirements (e.g., kinematic mounting, two bending moments, twist-correction, safety features, chin guard, active cooling). Subcontractor responsibilities include providing materials, a manufacturing schedule, and traveler documents. Delivery timelines range from 24 to 40 weeks After Receipt of Order (ARO).

Contract & Timeline

  • Contract Type: Firm Fixed Price Subcontract
  • Set-Aside: None specified
  • Proposal Due: June 9, 2026, 5:00 PM PST (extended by Amendment No. 1)
  • Proposal Validity: 90 days after submission
  • Published Date: May 27, 2026
  • Period of Performance: Delivery dates specified in weeks ARO (e.g., 24-40 weeks).

Evaluation Factors

Proposals will be evaluated using a Best Value Trade Off (BVTO) source selection process, where technical factors are more important than business factors and price. Evaluation will consider:

  • Volume I - Technical Proposal: Ability to meet technical requirements (demonstrated via data package and engineering drawings), manufacturing capabilities and capacity (including metrology and Quality Assurance Program), past performance, and major milestones/delivery schedule.
  • Volume II - Business Proposal: Price (completeness, realism, reasonableness), financial stability, and acceptance of contractual documents/terms.

Submission Requirements

Proposals must be submitted electronically as separate PDF documents for Technical (Volume I, 50-page max) and Business (Volume II) proposals to Giang Ngo (giangn@slac.stanford.edu). Required forms include various Representations and Certifications (e.g., SAM, E-Verify, Buy American Act), and an Offeror's Technical and Business Checklist. Requests for clarifications must be submitted in writing using Attachment 1 by May 15, 2026.

Additional Notes

SLAC's subcontracts are not Federal procurements and are not directly subject to FAR. Offerors must identify any exceptions to SLAC's standard terms and conditions. Giang Ngo is the sole point of contact for all inquiries.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 27, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
View
Mirror Benders | GovScope