Mold Line Separation Service

SOL #: W519TC26QA125Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RI
ROCK ISLAND, IL, 61299-0000, United States

Place of Performance

Rock Island, IL

NAICS

Electronic and Precision Equipment Repair and Maintenance (811210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components (J059)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 15, 2026
2
Last Updated
Apr 20, 2026
3
Submission Deadline
Apr 29, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, Army Contracting Command - Rock Island (ACC-RI), has issued a Combined Synopsis/Solicitation (W519TC26QA125) for Mold Line Separation Service at Rock Island Arsenal, IL. This requirement supports foundry modernization by electrically separating the Small and Large Mold Lines. An amendment has extended the proposal due date and announced a site visit opportunity on Friday, April 24, 2026, at 8 AM CST. This is an unrestricted acquisition.

Scope of Work

The objective is to electrically separate the Small Mold Line and the Large Mold Line, which are currently combined under one PLC control system. This separation is crucial for clearing space for an incoming sand router cell and facilitating the demolition of the small mold line equipment. The scope includes:

  • Providing labor, materials, travel, rental equipment, and reference materials for the electronic separation.
  • Conducting an engineering site visit to survey and validate the panel and control system.
  • Modifying PLC and HMI programming codes.
  • Removing all unused panel components and pulling/terminating unused wires.
  • Moving the control panel approximately ten feet and rerouting associated wiring.
  • Providing two days of stand-by training/production support.
  • Delivering updated electrical drawings after separation.

Contract & Timeline

  • Contract Type: Firm Fixed Price
  • Product Service Code: J059 (Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components)
  • NAICS Code: 811210 (Size Standard: $34,000,000.00)
  • Set-Aside: Unrestricted
  • Period of Performance: May 11, 2026, to July 03, 2026
  • Solicitation Issue Date: April 15, 2026
  • Site Visit: Friday, April 24, 2026, at 8 AM CST. Contact Christine Szalo by April 23, 2026, at Noon CST to arrange.
  • Proposal Due Date (Amended): April 29, 2026, at 10 AM Central Time

Special Requirements

Work must adhere to high performance standards, including neat and "work-man-like" execution, and compliance with OSHA, Corps of Engineers, EPA, State of Illinois, and Department of the Army Environmental Regulations. Proper off-island debris disposal and recycling are required. Security requirements include background checks for installation access, potential RAMP participation, and completion of Anti-Terrorism Level I and iWatch training. The Government retains unlimited rights to all documents and materials produced.

Contact Information

For questions or site visit arrangements, contact Christine Szalo at christine.a.szalo.civ@army.mil or 520-693-0301.

People

Points of Contact

Files

Files

Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View
Mold Line Separation Service | GovScope