Monongahela National Forest FR76 Embankment Stabilization Project

SOL #: 12445526B0007Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States

Place of Performance

WV

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 23, 2026
2
Last Updated
May 14, 2026
3
Submission Deadline
May 28, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Agriculture, Forest Service, is seeking construction services for the Monongahela National Forest FR76 Embankment Stabilization Project (ERFO 22) in Nicholas and Webster Counties, WV. This Invitation for Bid (IFB) is a Total Small Business Set-Aside for firms under NAICS 237310. The project involves significant road and stream stabilization work. Bids are due May 28, 2026, at 1:00 PM local time.

Scope of Work

The project requires comprehensive construction services to stabilize embankments along Forest Road 76 (FR-76) at two sites. Key tasks include:

  • Constructing three soldier pile and concrete lagging retaining walls.
  • Removing, resetting, and installing new drainage culverts and guardrails.
  • Dewatering Barrenshe Run, placing riprap along streambanks and in-stream, and regrading the stream channel.
  • Reconstructing and regrading portions of FR-76.
  • Installing rebar and non-shrink, high-strength grout along existing bridge abutment foundations. All work must adhere to Contract Drawings, FP-14 standards, and Forest Service Supplemental Specifications (FSSS).

Contract Details

  • Contract Type: Firm Fixed Price (IFB)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237310 (Construction Of Highways, Roads, Streets, Bridges, And Railways)
  • Small Business Size Standard: $45 Million
  • Period of Performance: Work must commence within 14 calendar days after Notice to Proceed and be completed by October 21, 2026.
  • Place of Performance: Site 1 (Nicholas County, WV) and Site 2 (Webster County, WV), near the Gauley Ranger Station.

Submission & Evaluation

  • Bid Submission Deadline: May 28, 2026, at 1:00 PM local time.
  • Required Submissions: Completed and signed SF1442, acknowledgement of all amendments, completed schedule of items, and a Bid Bond.
  • Evaluation Criteria: Award will be made to the lowest priced, responsible offeror who is responsive to the solicitation.
  • Offer Acceptance Period: 30 calendar days from the bid receipt date.

Key Dates & Actions

  • Questions Deadline: May 7, 2026, at 2:00 PM Central Time, via email to paul.boucher@usda.gov.
  • Organized Site Visit: May 13, 2026, at 10:00 A.M. Eastern Time, at Gauley Ranger station, 932 North Fork Cherry Road, Richwood, WV 26261. An attendee list will be posted.
  • Public Bid Opening: Will be held virtually via Microsoft Teams; attendance information to be posted later.

Important Attachments

Bidders must review the Statement of Work (SOW) for detailed requirements, Embankment Stabilization Project Drawings for design specifics, the Schedule of Items for pricing, and FP-14 Standard Specifications for technical and contractual guidelines. Wage Rates (WV20260098) for West Virginia counties are also provided and are crucial for labor cost estimation. Amendments 0001 and 0002 incorporate mandatory clauses and schedule the site visit.

People

Points of Contact

BOUCHER, PAUL APRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: May 14, 2026
View
Version 5Viewing
Solicitation
Posted: May 12, 2026
Version 4
Solicitation
Posted: Apr 28, 2026
View
Version 3
Solicitation
Posted: Apr 27, 2026
View
Version 2
Solicitation
Posted: Apr 23, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 23, 2026
View